  • Question 61:

    DRAG DROP

    You are a manufacturer using Druitt 365 Supply Cham Management

    A new series of orders is authorized for production.

    You need to identify which documents to use for the released production order.

    Which document should you use tor each requirement?

    To answer drag the appropriate documents to the correct requirements. Each document nay be used once more than once. or not at all. You may need to drag the split bar between panes or scroll to view content.

    NOTE: Each correct selection is worth one point.

    Select and Place:

  • Question 62:

    A company is implementing Dynamics 365 Supply Chain Management in its manufacturing environment, where formulas are used to manage material consumption for batch orders. During production, some items in the formula must be consumed automatically from the production area, while others must be picked manually with their actual consumption reported on a pick list.

    You must determine how to configure the formula lines to allow for the desired mixed-method picking processes.

    What are two possible ways to achieve this goal? Each correct answer provides a complete solution.

    NOTE: Each correct selection is worth one point.

    A. Set the ushing principle on each formula line based on consumption method for the line.
    B. Leave the ushing principle blank on formula lines and set default ushing principle on the items based on consumption method for the item.
    C. Leave the ushing principle blank on formula lines and set resource consumption to direct ushing principle of materials based on consumption method for the line.
    D. Leave the ushing principle blank on formula lines and set the default start value to Always for Automatic Bill of Material Consumption.

  • Question 63:

    A manufacturer uses Dynamics 365 Supply Chain Management.

    The engineering department constantly revises product designs to stay current with the latest technology.

    The customer service department places orders lot the products but frequently adds a prototype product version that is not yet operational.

    The manufacturer requites a solution that notifies customer service if a prototype version is selected on a sales order.

    You need to configure the solution.

    What should you configure?

    A. product release policy
    B. product lifecycle states
    C. version number rule
    D. engineering product category

  • Question 64:

    DRAG DROP

    A process manufacturing company is implementing Dynamics 365 Supply Chain Management and plans to use various process manufacturing functionalities, including by-products.

    You need to configure by-product formula allocation methods to accurately manage and allocate costs.

    Which allocation methods should you use? To answer, drag the appropriate by-product burden allocation methods to the correct scenarios. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

    NOTE: Each correct selection is worth one point

    Select and Place:

  • Question 65:

    HOTSPOT

    A bicycle manufacturer uses Dynamics 365 Supply Chain Management.

    The manufacturer experiences a supply chain issue with a metal used to fabricate the wheel.

    Due to the issue, the manufacturer must change the bicycle wheel assembly temporarily.

    Production workers require an interactive visual guide to complete production.

    You need to configure the features.

    Which features should you configure? To answer, select the appropriate options in the answer area.

    NOTE: Each correct selection is worth one point.

  • Question 66:

    A company uses production orders to assist with timely inventory delivery to the shop floor.

    Inventory items for production orders are not being delivered from the warehouse in time for the production runs.

    You need to ensure that the inventory items are available when needed.

    Which option should you select?

    A. Route card
    B. Job scheduling
    C. Job card
    D. Batch job

  • Question 67:

    You need to determine the sales price for a new limited-edition bicycle for the summer season.

    What should you do?

    A. Run inventory close for the BOM items for the limited-edition bicycle.
    B. Create the production order for the limited-edition bicycle and click estimate.
    C. Run the category price rules for the limited-edition bicycle using a cost-plus calculation.
    D. Run the pricing simulator for the limited-edition bicycle for a quantity of one.

  • Question 68:

    You need to configure the system to track the cost and delivery performance of VendorZ.

    Which two actions should you perform? Each correct answer presents a complete solution.

    NOTE: Each correct selection is worth one point.

    A. Create a service product and set Stocked product = No.
    B. Add an activity to the production route for deliveries.
    C. Add an activity to the production flow for deliveries.
    D. Create a service product and set Stocked product = Yes.

  • Question 69:

    HOTSPOT

    A construction company specializes in building residential and commercial structures and uses discrete manufacturing in Dynamics 365 Supply Chain Management.

    The company has the following business requirements:

    1. Construction tasks must be scheduled according to the project delivery date.

    2. All raw materials must be available at the start of the job.

    You need to configure job scheduling for each production order.

    What settings should you configure to meet these requirements? To answer, select the appropriate options in the answer area.

    NOTE: Each correct selection is worth one point.

  • Question 70:

    DRAG DROP

    A company uses Process manufacturing and has a rush order that must be partially completed due to employees working a half day for a company event.

    After reviewing the net requirements of the batch order, it is determined that 400 units out of the total 1,400 units must be completed today. The production manager needs to:

    1. Retain the original batch number for the 400 units.

    2. Ensure that the original batch number appears on customer documentation.

    You need to split the batch order into two separate orders while meeting these requirements.

    Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

    Select and Place:

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Microsoft exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your MB-335 exam preparations and Microsoft certification application, do not hesitate to visit our Vcedump.com to find your solutions here.