A co uses the asset management module in Supply Cham Management. The company has four conveyer systems in the warehouse. A robotic crane moves pallets of products to its conveyer int. Each robotic crane and conveyer line is considered a multilevel asset.
A work order arrives for a conveyer system. A technician completing the work observes that the robotic crane needs a repair. The technician is not qualified to work on the robotic crane.
You need to ensure that the robotic is repaired.
Which two options should you configure? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
A. Create a manual work order.HOTSPOT
A manufacturer uses Dynamics 365 Supply Chain Management to create bicycle parts as a configuretoorder configuration. All bicycle parts are sourced from external sources and assembled in the manufacturing facility.
The manufacturer plans to expand its capabilities to create custom bicycles parts in an engineer-toorder model. All bicycle parts will be created in the manufacturing facility. The custom bicycle parts must be omitted from any master planning process.
You need to describe the concepts for the requirements.
Which concepts should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

You need to report newly manufactured bicycles as finished products.
Which three options can you use? Each correct answer presents a complete solution.
A. Route card journalDRAG DROP
A manufacturing company is implementing Dynamics 365 Supply Cham Management.
Bill of materials (BOMs) must be calculated using standard cost principles.
Miscellaneous charges must be included in the unit cost price. The explosion mode must arways be enforced as single level.
You need to configure the system to meet the requirements.
Which configuration should you enable for each requirement? To answer, drag the appropriate configurations to the correct requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place:

A company uses Process manufacturing for most products and Discrete manufacturing for other products. The company is creating a formula for a new product. The new item will be used to make a name brand product and two generic brand products.
This item has the following requirements:
You need to create a produced item that can make two generic items and one main item.
How should you set up the item?
A. Create the name brand item as a Bills of material production type item. Add the two generic items on the Bills of material for the name brand product and use line type phantomHOTSPOT
You need to configure the warehouse manager's ModelA subassembly production requirements.
Which setting should you use?
To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

A client subcontracts production work to a vendor for production operations. You need to model subcontracting of route operations in production orders.
Solution: Ensure that cost control allocates subcontracted work in its own cost breakdown block.
Does the solution meet the goal?
A. YesNote: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it.
As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.
The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor. Ingredient A is the primary active ingredient In the lotion. Ingredients is used as a compensating ingredient.
You need to ensure that the system is set up to support the manufacturing process.
Solution: Set up the batch attributes for a minimum value, a maximum value, and a target level for the filler ingredients.
Does the solution meet the goal?
A. YesDRAG DROP
A pharmaceutical manufacturer uses Process manufacturing.
You are consolidating planned batch orders for a specific medication.
The order must cover two weeks of demand. No other items need to be consolidated.
You need to change the coverage group of the items.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Select and Place:

HOTSPOT
You are the production scheduler at a manufacturing company. You schedule estimated production orders and ensure that capacity is used efficiently.
You have an order that must be scheduled at the resource group level and scheduled backward from the delivery date specified on the production order.
You need to schedule the order.
Which scheduling parameters should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Microsoft exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your MB-335 exam preparations and Microsoft certification application, do not hesitate to visit our Vcedump.com to find your solutions here.