  • Question 221:

    A company uses Lean manufacturing processes with Kanban boards. When unexpected transfer jobs occur, the boards do not clear correctly.

    You must ensure that the boards are cleared properly.

    What are two possible ways to clear the board? Each correct answer represents a complete solution.

    NOTE: Each correct selection is worth one point.

    A. Remove the planned Kanban job.
    B. Change unplanned to planned.
    C. Delete the unplanned job.
    D. Revert the planned Kanban job status.

  • Question 222:

    A customer produces light projection toys for holiday decorations throughout the year.

    You are in the first month of a season. Production flows take one day to complete.

    The floor supervisor reports that seasonal production targets will not be met.

    You review the Kanban schedule board and identify thousands of unplanned jobs.

    You need to plan the jobs to be completed two weeks prior to the start of the next season.

    What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

    NOTE; Each correct selection is worth one point.

    A. Set the Automatic planning option for each unscheduled job to Yes.
    B. Manually schedule each unscheduled job forward from the date of the end of the season.
    C. Manually schedule each unscheduled job to the previous period of the end of the next season.
    D. Set the Automatic planning option for each unscheduled job to No.
    E. Manually schedule each unscheduled job on its due date.
    F. Manually schedule each unscheduled job to the next period of the start of the next season.

  • Question 223:

    Note. This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.

    After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.

    A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.

    The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor. IngredientA is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient

    You need to ensure that the system is set up to support the manufacturing process.

    Solution: Configure the catch weight of IngredientA to allow for the variances of the concentrations received from the different vendors.

    Does the solution meet the goal?

    A. Yes
    B. No

  • Question 224:

    HOTSPOT

    You need to set up the chocolate items.

    Which values should you select? To answer, select the appropriate options in the answer area.

    NOTE: Each correct selection is worth one point.

  • Question 225:

    DRAG DROP

    A company makes lubricants and greases used in the automotive industry. The company plans to implement Dynamics 365 Supply Chain Management.

    The system must meet the following requirements:

    1. Schedule the batch production of products.
    2. Plan for inventory fluctuations of ingredients that are used across different products.
    3. Schedule delivery of amounts of proprietary compounds used during production from vendors to keep production runs on schedule and eliminating excess stock on hand or delayed production.

    You need to perform the initial setup of the company's Dynamics 365 environment.

    At which level should you set up the items? To answer, drag the appropriate setup levels to the correct setup options. Each setup level may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

    NOTE: Each correct selection is worth one point.

    Select and Place:

  • Question 226:

    You need to address the ignition switch issue.

    Which three actions should you perform? Each answer presents part of the solution.

    A. Copy link and products.
    B. Set product readiness to manual.
    C. Define business impact.
    D. Set product readiness to automatic.
    E. Change product lifecycle state.

  • Question 227:

    You are the production supervisor at a chemical processing plant.

    You must track attributes for each batch of chemicals. Automated quality orders must be generated when a batch order for these chemicals is reported as finished.

    You need to ensure that the values of attributes are updated and tracked.

    What three actions should you perform? Each correct answer presents part of the solution.

    NOTE: Each correct selection is worth one point.

    A. Create attribute types.
    B. Create a test instrument for each attribute.
    C. Set up batch attributes.
    D. Assign the attributes to the appropriate test on the test group.
    E. Assign the attributes to the chemicals.

  • Question 228:

    HOTSPOT

    You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.

    NOTE: Each correct selection is worth one point.

  • Question 229:

    You need to create the production orders for standard model bicycles.

    Which method should you use?

    A. Sales order line
    B. Master planning execution
    C. Supply schedule form
    D. Released item
    E. All production orders form

  • Question 230:

    DRAG DROP

    A manufacturing company uses Dynamics 365 Supply Cham Management.

    The company operates three eight-hour shifts per day. Monday through Friday.

    The company purchased equipment for a new process that cannot be performed with easting equipment.

    This specialized equipment performs only this unique task.

    The machinery must always be monitored and controlled by a worker.

    The machine must be added to the existing production line and be ready as soon as possible.

    Future planned production orders must not overload the running maximums of the new machine.

    You need to configure the system.

    Which four actions must you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

    Select and Place:

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Microsoft exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your MB-335 exam preparations and Microsoft certification application, do not hesitate to visit our Vcedump.com to find your solutions here.