EADP19-001 Exam Details

  • Exam Code
    :EADP19-001
  • Exam Name
    :ArcGIS Desktop Professional 19-001
  • Certification
    :Esri Certifications
  • Vendor
    :Esri
  • Total Questions
    :93 Q&As
  • Last Updated
    :

Esri EADP19-001 Online Questions & Answers

  • Question 1:

    An ArcGIS user receives a drawing file created in AutoCAD, and is told the data is in NAD 1983 State Plane coordinates. When compared with data for the same area, the .dwg file is too big.

    Which property of the data should the ArcGIS user check first?

    A. central meridian
    B. latitude of origin
    C. datum
    D. units of measurement

  • Question 2:

    An ArcGlS user receives parcel data from the regional government, which is supposed to line up with parcels in the data maintained by the local government. The user is tasked with reconciling the discrepancies between the local and regional data.

    In which situation are the parcel boundaries within the local data more likely to be accurate than the regional data?

    A. when local records show a parcel subdivided in 2007 but regional records do not include the update
    B. when regional records show a new survey of a parcel in 1996. but local records do not include the survey information
    C. when a privately owned parcel is donated to the local government in 2002 for a park but the regional government does not have a record of the new owner
    D. when a new subdivision surveyed in 2004 within the regional area is incorporated into the local area limits in 2007

  • Question 3:

    An analyst has a multi band raster, but needs just one of the bands for a project. Which geoprocessing tool should be used to extract a single band?

    A. Slice (3D Analyst)
    B. Extract by Attributes (Spatial Analyst)
    C. Composite Bands (Data Management)
    D. Clip (Data Management)

  • Question 4:

    A school bus dispatcher needs to create a bus route that stops at student homes during specific time ranges. Which Network Analyst setting should the dispatcher use to accomplish this task?

    A. Impedance Time
    B. Time Windows
    C. Start Time
    D. Time Accumulation

  • Question 5:

    An ArcGIS user is creating a processing environment that will be used repeatedly. To confirm results, the user wants to visualize the output of Intermediate processes during testing. The user is working with large data sets and wants to preserve already-complete steps and focus on one problem at a time.

    Which geoprocessing approach should the user consider?

    A. a Python script tool commenting out code blocks and functions as development progresses
    B. the Python window saving the contents to a script when each processing step is confirmed
    C. a stand-alone Python script executed in PythonWin with print statements capturing ArcPy messages
    D. ModelBuilder running processes step-wise and displaying intermediate results in ArcMap

  • Question 6:

    A representation layer has been defined using the option to save changes to the geometry of the supporting feature. If the geometry of the feature is modified using the tools from the Representation toolbar, what will be modified?

    A. the Shape field of the feature
    B. the shape In the override field
    C. the feature attributes
    D. the override attributes

  • Question 7:

    An ArcGIS user wants to make a map displaying the data using an equal number of features in each classification. Which classification method should the user employ to accomplish this?

    A. equal Interval
    B. natural breaks (Jenks)
    C. quantile
    D. standard deviation

  • Question 8:

    An ArcGIS user in a county office receives a large volume of data In shapefiles, coverages and table formats. The user is responsible for converting the data to a standard feature class format and writing it into a central enterprise geodatabase. The data must be simultaneously available for editing and spatial analysis tasks.

    How should the Windows Task Scheduler be used to achieve these goals?

    A. schedule to run a geoprocessing service with (he [asks and maintain log of script validation errors
    B. schedule to run a geoprocessing service with the tasks and allocate a specific lime to run each task in the service
    C. patch the tasks in a script and schedule to run the script at a scheduled time at non- peak hours
    D. patch the tasks In a model and schedule to run the model at a scheduled time at non- peak hours

  • Question 9:

    A raster dataset called rasterl.tif contains many pixels with values of NoData.

    Which map algebra expression changes NoData values to 0 (zero) in the output raster dataset while leaving all other pixel values the same?

    A. con(rasten.tif = NoData. 0 raster!, tif)
    B. con(rasten.tif = = NoData, 0, rasterl.tif)
    C. con(isnull(raster1.tif). 0, rasterl.tif)
    D. con(setnull{raster1.tif), 0, rasterl.tif)

  • Question 10:

    An ArcGlS user decides to use labels in a map document because the annotation appears pixelated as the user zooms from the reference scale.

    What Is a potential effect of this decision?

    A. Label placement will be controlled by the user
    B. Text placement will become static
    C. Labels will only draw at the reference scale
    D. The map will render more slowly

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Esri exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your EADP19-001 exam preparations and Esri certification application, do not hesitate to visit our Vcedump.com to find your solutions here.