You are using Microsoft Test Manager (MTM).
You are developing a test that requires a test step to verify a result against a known value. You plan to insert a new step to accomplish this task.
You need to make the new step a validation step.
What should you do?
A. Type the expected value into the Expected Result column of the new test step.You are a QA tester on a development team. You are responsible for a large number of test cases on your current project.
You need to bulk edit test steps in a large group of test cases.
Which tool should you use?
A. Web Test case ManagementYou are using Microsoft Test Manager (MTM). Your development team is using Team Foundation Server (TFS) 2012 to associate requirements with source code and to automate builds.
Your team has been testing against an old build. You want to assign a more recent automated build to the test plan.
You need to review the requirements that have been affected between the current build and the new build before assigning it to your test plan.
What should you do?
A. In the Properties View of the Plan activity, click Modify the Build In Use. Select the appropriate build in the Available builds. Review the Associated work items between selected builds list.You are part of a test team that uses Microsoft Test Manager (MTM) on a project. The project uses the Microsoft Visual Studio Scrum 2013 process template.
Your test team constantly adds new test cases.
You need to create a test suite that automatically includes all test cases related to the Accounting section of the application.
What should you do?
A. Create a requirements-based test suite that includes all requirements with an Area Path of Accounting.You plan to conduct a manual test for an ASP.NET website by using Microsoft Test Manager (MTM). You create a test plan named Calculate_Margin by using Testing Center in MTM.
You need to link all the test cases that belong to the Calculate_Margin test plan with new requirements that are stored as work items in Team Foundation Server 2012.
What should you do?
A. In the Links section of the test plan, click Add link to associate the requirements document.You are using Microsoft Test Manager (MTM). You have created some shared steps for a recurring test sequence.
You plan to use these shared steps with fast-forward playback in multiple test cases.
You need to create an action recording for the shared steps.
What are two possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose two.)
A. Include the shared steps work item in the test case. Start running the test case with action recordings enabled. When the shared steps are reached, select Start and record.You plan to conduct a test for a multi-tier ASP.NET website using Microsoft Test Manager (MTM). You have created a test plan named QA Release 1.0. You also have created a test setting for the QA Release 1.0 test plan with the Database, Web Client, and Web Server roles.
The QA Release 1.0 test plan must specify that test runs:

Collect specific diagnostic trace information to help analyze bugs that are difficult to reproduce, and

Collect information about which methods of your applications code were used when a test case was run.
You need to configure the QA Release 1.0 test plan to meet these requirements.
What should you do?
A. Enable and configure the IntelliTrace, ASP.NET Client Proxy for IntelliTrace and Test Impact diagnostic data adapter settings.You are using Microsoft Test Manager (MTM). You are supporting a set of different configurations for your product.
You plan to prepare the test plan by assigning the tester for each test case.
You need to configure the test plan to support this requirement.
What should you do?
A. Assign the tester to each combination of test case and configuration.You are using Microsoft Test Manager (MTM) to run an automated test suite with 240 long- running tests.
In your test environment, you have set up four client machines to run these tests. You have assigned the Client role to all four machines.
You need to make sure that when you run the test suite, the tests are distributed equally over all four client machines.
What should you do?
A. Add an even amount of RAM to all four machines.Your team uses Microsoft Test Manager to manage test cases. You are creating test plans for your team to use.
You need to update your test plan properties before your team creates test suites and test cases.
Which two test plan properties should you set? Each correct answer presents part of the solution.
A. Expected ResultsNowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Microsoft exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 70-497 exam preparations and Microsoft certification application, do not hesitate to visit our Vcedump.com to find your solutions here.