  • Question 61:

    An engineer is troubleshooting a fabric discovery failure. Which two requirements must an engineer verify about switch connectivity to solve the problem? (Choose two.)

    A. A Cisco APIC must be attached to a spine node only.
    B. A Cisco APIC must be attached to leaf nodes.
    C. Spine nodes must connect to other spine nodes.
    D. A Cisco APIC must be dual-attached to two separate spine nodes.
    E. Leaf nodes must connect to spine nodes only.

  • Question 62:

    Refer to the exhibit.

    An integration issue occurs between the Cisco Intersight and Cisco UCS C240 server. The requirements are to install the server OS through virtual media directly from Cisco Intersight, and to be able to perform the task from HQ. However, the 10.1.1.0/24 network is not reachable from HQ. Which action must be taken on UCS C240 to resolve the issue?

    A. Set the connector Access Mode to Read Only.
    B. Disable the device connector.
    C. Enable tunneled vKVM from the CIMC.
    D. Change the assigned license to be essential.

  • Question 63:

    What does this adapter output indicate? adapter 1/6/1 (fls): 2# lunlist 9 vnic: 9 lifid: 6

    -FLOGI State : flogi est (fc_id Oxac0e04)

    -PLOGI Sessions

    - WWNN 50:0a:09:83:8d:53:43:44 WWPN 50:0a:09:83:8d:53:43:44 fc_id 0x000000

    -LUN's configured (SCSI Type, Version, Vendor, Serial No.)

    -LUN ID: Ox0000000000000000 access failure -REPORT LUNs Query Response

    -

    Nameserver Query Response -WWPN: 54:b1:6a:94:64:3e:73:44

    A. The configured initiator LUN ID does not match the configured target LUN ID
    B. The target device configuration does not allow the initiator to access the LUN
    C. The port types between the target and initiator are incorrectly configured
    D. The target of the configured zone does not match the target of the configured boot order

  • Question 64:

    Refer to the exhibit.

    The scheduled Test job fails to be reconfigured with extra configuration on Cisco 9000 Series Switch. Which action resolves the issue?

    A. Stop the job before reconfiguration.
    B. Create the scheduler configuration again.
    C. Use the edit command to modify the job.
    D. Edit the job using the change command.

  • Question 65:

    An engineer is troubleshooting a packet flow from an access leaf to spine. Which EVPN routes are expected on this connection?

    A. EVPN Type 1-5
    B. EVPN Type 0,9,15
    C. EVPN Type 9-15
    D. EVPN Type 0,16

  • Question 66:

    Refer to the exhibit.

    vPC between switch1 and switch2 is not working. Which two actions are needed to fix the problem? (Choose two.)

    A. Match vPC domain ID between the two devices.
    B. Configure IP address on the interface.
    C. Activate VLANs on the vPC.
    D. Configure vPC peer link and vPC peer keepalive correctly.
    E. Configure one of the switches as primary for the vPC.

  • Question 67:

    Refer to the exhibit. The Eth 1/6 on the switch remains in a down state when the show interface eth1/6 command is entered. Which action resolves the problem?

    A. Associate port Eth1/5 to FEX 104.
    B. Associate port Eth1/6 to FEX 108.
    C. Associate port Eth1/6 to FEX 110.
    D. Associate port Eth1/5 to FEX 101.

  • Question 68:

    The Cisco Nexus switch is connected to a peer switch that is not running Cisco NX-OS. The switches are connected using port channel and are experiencing packet loss. Which action should be performed on the Cisco Nexus switch ports to resolve this issue?

    A. Turn on lacp suspend-individual.
    B. Turn on lacp graceful-convergence.
    C. Turn off lacp graceful-convergence.
    D. Turn off lacp suspend-individual.

  • Question 69:

    Refer to the exhibit.

    A network engineer is troubleshooting a Cisco Nexus 5000 Series Switch. The interface between the server and the switch is nonoperational and is expected to operate at 10 Gbps. The drain rate of the interface is 3 Mbps. Which action resolves the issue?

    A. Configure pause error-disable recovery
    B. Enable link level pause on the interface
    C. Reset priority flow counters
    D. Set priority flow control pause

  • Question 70:

    Refer to the exhibit.

    The scheduler was configured to save the running-config automatically daily. However, the scheduler is returning the error presented. Which action resolves the issue?

    A. Reconfigure the scheduler using the admin user
    B. Use the kstack attribute for copying the configuration file
    C. Remove vrf management from the command
    D. Change the file transfer protocol to TFTP in scheduler job

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Cisco exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 300-615 exam preparations and Cisco certification application, do not hesitate to visit our Vcedump.com to find your solutions here.