Refer to the exhibit. After a power outage, the application team reported that the Cisco UCS C-Series server is reachable only via the server's Cisco IMC and not via the operating system's IP address. Which action resolves the issue?
A. Enable SSH from the communication service.An engineer connected two Cisco UCS I/O modules to fabric interconnect with four links. When link 4 between the IOM-1 and primary fabric interconnect went down, the connectivity through IOM-1 from blade slots 3, 4, 7, and 8 failed over to IOM-2 and to the standby fabric interconnect.
Which action allows traffic to fail back over to IOM-1?
A. Re-acknowledge the chassis.What does "line protocol is down" indicate in this output?


Refer to the exhibit. This configuration has been applied:
1.
Eth1/5 and Eth1/7 as uplink ports and belong to port-channel 100
2.
Eth1/6 and Eth1/12 as uplink ports and belong to port-channel 200
Two Cisco Nexus 9000 Series Switches, SW1 and SW2, fail to form a virtual port channel toward both fabric Two Cisco Nexus 9000 Series Switches, SW1 and SW2, fail to form a virtual port channel toward both fabric interconnect switches. Which set of ports must be allocated to which port channels to resolve the issue?
A. Eth1/8 and Eth1/10 members of port-channel 100 Eth1/9 and Eth1/11 members of port-channel 200A network engineer is attempting to integrate Cisco UCS Manager with Cisco UCS Central, but the integration fails. The engineer can ping Cisco UCS Central from Cisco UCS Manager. Which two actions resolve the issue? (Choose two.)
A. Allow port 9443 between Cisco UCS Manager and Cisco UCS Central.
Refer to the exhibit. The Eth 1/6 on the switch remains in a down state when the show interface eth1/6 command is entered. Which action resolves the problem?
A. Associate port Eth1/5 to FEX 104.An engineer implemented the EEM applet shown below to send a syslog message when an interface goes down:
event manager applet interface_down
action 1.0 cli command "show interface status"
action 2.0 syslog priority notifications msg Interface is down
However, the applet fails to work as intended. Which statement must be added to the EEM applet to resolve the issue?
A. event syslog pattern
Refer to the exhibit. Two Cisco Nexus 9000 Series Switches fail to establish OSPF adjacency. Which configuration resolves the issue?
A. N9K2(config)# interface loopback 0 N9K2(config-if)# ip address 3.3.3.3/32
Refer to the exhibit. The data centers are connected using the EVPN Multi-Site solution. However, VLAN 10 fails to extend to the secondary site with the message shown. Which action extends VLAN 10 to the secondary site?
A. Configure multisite DCI-tracking on interface Eth1/18.
Refer to the exhibit. A Cisco Nexus 9000 Series Switch must be configured to use only TACACS+ servers for default authentication. The engineer notices that the activity fails to run as expected. Which code snippet resolves the issue?
A. aaa authentication login default group ISE-TACACS noneNowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Cisco exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 300-615 exam preparations and Cisco certification application, do not hesitate to visit our Vcedump.com to find your solutions here.