ISTQB-CTAL-TM Exam Details

  • Exam Code
    :ISTQB-CTAL-TM
  • Exam Name
    :ISTQB Certified Tester Advanced Level - Test Management (CTAL-TM) v3.0
  • Certification
    :ISTQB Certifications
  • Vendor
    :ISTQB
  • Total Questions
    :228 Q&As
  • Last Updated
    :May 30, 2026

ISTQB ISTQB-CTAL-TM Online Questions & Answers

  • Question 151:

    You have just joined a medium-sized company as a senior Test Manager. You would like to take a more proactive approach to process improvement than this company has done in the past. The company uses the V-model as its software

    development lifecycle. The list below shows five items that are not currently captured on defect reports from dynamic testing.

    Which TWO of these items will be MOST useful for identifying potential test process improvements?

    A. The component or subsystem in which the defect was found
    B. The type of the defect, from a defect taxonomy
    C. The level of testing which found the defect
    D. The risks involved in fixing the defect
    E. The lifecycle activity in which the defect was created

  • Question 152:

    You are preparing the estimate for the test plan, which should cover all test activities subsequent to the plan having been agreed. Estimation of test activities has in the past been embarrassingly inaccurate. Historical data from previous

    similar projects is unreliable, but for two recent projects it is possible to find out how many test cases were developed and how long this took.

    Which TWO of the following estimation techniques will be BEST in this scenario?

    A. Historical data extrapolation
    B. Test case quantity / effort per test case
    C. 3-point estimation
    D. Wideband Delphi
    E. Planning poker

  • Question 153:

    You are interviewing a candidate for the position of test analyst. At one stage of the interview, you are looking specifically for skills in the area of professional competence. Which of the following skills would demonstrate this?

    A. Analytical ability
    B. Ability to delegate
    C. Black box test design
    D. Communication

  • Question 154:

    Which of the following are Test Closure activities? SELECT ONE OPTION

    a- All results lodged in configuration management system - for example test plans, results, logs, reports.

    b- Plans in place for lessons to be learnt to ensure that good practices are repeated and poor practices are not.

    c- Checks undertaken to ensure that all test work is completed - all tests executed or skipped, all defects managed to appropriate conclusion.

    d- All project closure activities completed - for example customer training completed, and analysis of vendor performance undertaken.

    e- AM testing work products delivered to those that need them - for example environments/ regression test sets passed to maintenance.

    f- Checks undertaken to ensure that all tests have been executed, with all defects confirmed as fixed by retesting.

    A. a, c, d and f.
    B. a, b, c and e
    C. a.b, e and f.
    D. b, c. d and e.

  • Question 155:

    Which of the following is the MOST relevant factor to consider when selecting an open source tool? SELECT ONE OPTION

    A. The number of testers that will use the tool.
    B. The initial cost of the tool and ongoing annual costs.
    C. The number of user screens in the tool.
    D. The formal user support available for the tool.

  • Question 156:

    Consider the following metrics:

    a- Percentage of all product risks identified during initial risk analysis b- Average time taken by developers to fix defects for each severity level c- Statement coverage achieved by the component test suite d- Breakdown of defects detected by test level

    How many of the five primary dimensions for test progress monitoring have been addressed by these metrics? SELECT ONE OPTION

    A. 2
    B. 4
    C. 1
    D. 3

  • Question 157:

    You have assembled the following cost of quality numbers 200 defects were found prior to release and 100 were found after.

    Given this information what is the total cost of quality for this project?

    A. $300,000
    B. $200,000
    C. $100,000
    D. $10 000

  • Question 158:

    Which three of the following would be considered a good mix of technical and interpersonal skills (hard and soft), for a test team leader?

    a- Ability to compliment a developer.

    b- Presenting information regarding a test project progress to stakeholders

    c- Using a configuration management tool.

    d- Ability to read a development coding language

    e- Assessing a failure and documenting it correctly.

    A. c.d and e.
    B. a.b and e.
    C. a.c and d.
    D. b, d and e.

  • Question 159:

    Which of the following Is considered a heavyweight risk-based testing technique?

    A. Systematic software testing
    B. Pragmatic risk analysts
    C. Brainstorming
    D. Hazard analysis

  • Question 160:

    Which of the following is a typical use of risk analysis? [1]

    A. Identifying the appropriate depth of testing for each identified risk
    B. Deciding what personnel should be assigned to which tests
    C. Determining the design of the tests used to mitigate each identified risk
    D. Forecasting the product delivery date

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only ISTQB exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your ISTQB-CTAL-TM exam preparations and ISTQB certification application, do not hesitate to visit our Vcedump.com to find your solutions here.