ISTQB-CTAL-TM Exam Details

  • Exam Code
    :ISTQB-CTAL-TM
  • Exam Name
    :ISTQB Certified Tester Advanced Level - Test Management (CTAL-TM) v3.0
  • Certification
    :ISTQB Certifications
  • Vendor
    :ISTQB
  • Total Questions
    :228 Q&As
  • Last Updated
    :May 30, 2026

ISTQB ISTQB-CTAL-TM Online Questions & Answers

  • Question 131:

    You are Test Manager working on a project which is improving the user interface for its call centre staff handling customer enquiries. The project has completed UAT for the first iteration; however a large number of defects were raised by call

    centre staff seconded to help with the User Acceptance testing.

    The defects described the user interface as not being intuitive enough with a poor 'help' facility. A user representative spent a week working with developers and system testers to explain the issues, which were subsequently agreed to have

    resulted from poorly specified usability requirements.

    The requirements were defined separately for each iteration and have been formally reviewed by business analysts, developers and the IT director.

    The user representative was also able to answer a number of other questions that the system test team had regarding call centre workflows, which improved their domain knowledge.

    You have been asked to conduct a project retrospective and recommend improvements for the next iteration which introduces further user interface changes. Which of the following would be the MOST effective improvement for the next

    iteration?

    A. System test analysts to attend external training on usability testing techniques.
    B. System test cases to incorporate usability testing and be reviewed by a call centre user representative.
    C. Call centre representatives to participate in reviews of the user interface requirements.
    D. A call centre user representative to be seconded to the system test team to help improve test design.

  • Question 132:

    Your last project was released three months ago and used a risk-based approach. In production, a number of serious failures in low risk areas have occurred. What is the most important lesson to be learned from this information? [2]

    A. The "lessons learned" session should have been conducted prior to deployment.
    B. A broader cross-functional team should contribute to the risk analysis.
    C. The project manager should have set stakeholder expectations for serious failures.
    D. Future projects should test the lower risk areas first.

  • Question 133:

    Which of the following aspects should test progress metrics be mapped to? [1]

    A. Lines of code
    B. Exit criteria
    C. Post-implementation defect discovery rate
    D. Defect resolution rate

  • Question 134:

    Your customer is closely involved in the development project. Requirements are communicated verbally and rarely written down. An iterative development model is being followed and time boxing is used to stay on schedule. Which of the following statements is true? [3]

    A. A requirements traceability matrix will be created at the start of each iteration.
    B. Your developers are using a waterfall methodology.
    C. There is a risk that the system architecture may have to be changed during the development process.
    D. Testing will start when all coding is completed.

  • Question 135:

    In what environment are you most likely to see multiple defect management systems used in one project?

    A. Sequential
    B. Agile
    C. Hybrid
    D. Multi-tenant

  • Question 136:

    Assume that you are working for a company that has maintained and tested a car parking permit system for many years. The system holds the name and address of permit holders and automatically writes to the permit holder with a form to

    renew or cancel their permit each year.

    The test plan states the following:

    "since the system is considered a stable system. Boundary Value Analysis is the only test case design technique that needs to be applied during testing"

    Consider the following change that was detailed in the Requirements Specification for a replacement to an existing parameter held within the system;

    The specified renewal date for each permit must be not be after 31 st January 2020. Which one of the following is a valid test condition that satisfies both the requirement and the test plan? SELECT ONE OPTION

    A. Input the dates either side of and including 31/01/2020, and select tests from the regression pack relating to the renewal date and printing only.
    B. Input the date 31/01 /20 in the wrong field to see what happens, and run the whole of the regression test pack.
    C. Input the date 01/02/2020 and confirm this is not accepted. and select tests from the regression test back relating to the renewal date only
    D. Input a date in an invalid format e.g. 31 FEB 2020, and select tests from the regression pack relating to renewal date, policy holder's name, address and printing.
    E. Input the date 01/02/2020 and confirm this is not accepted. and select tests from the regression testback relating to the renewal date only

  • Question 137:

    You are managing the testing for a bank card project. The testing was scheduled to take 10 weeks but by the time the software was developed only six weeks were available for testing Knowing there were a lot of risks with the software your team started testing activities early by overseeing code reviews, defining acceptance criteria by working with the users and by doing all lest creation prior to the code arriving.

    You are now three days away from the go-live date.

    Your testing has mitigated all the high and medium risk items leaving only the low-risk elements unmitigated by testing.

    You estimate it will take two weeks to manually test the low-risk elements.

    At this point what should you do?

    A. Automate the testing of the untested elements to ensure they are covered
    B. Block the go-live and start testing the low-risk elements immediately
    C. Transfer the risk of the untested low-risk items to the help desk
    D. Select one of the low-risk elements and perform depth testing to assess the residual risk

  • Question 138:

    You have decided to help your team improve their skills. One of their assignments is to mentor a junior member of the team Which competency should you expect the mentor to develop during this exercise?

    A. Social
    B. Professional
    C. Methodological
    D. Biological

  • Question 139:

    When Is the metric for the percentage of requirements coverage defined?

    A. Test planning
    B. Test monitoring
    C. Test execution
    D. Test completion

  • Question 140:

    As the Test Manager working for a company developing safety related software for defence equipment, you have been asked to consider how you can track test progress and report on the following:

    1) Test cases adequately cover all requirements 2) Issues relating to safety critical vulnerabilities are being addressed in priority order 3) How much of the developed system has been exercised through testing

    What tools would help to achieve this? SELECT ONE OPTION

    A. A Defect Management tool, static analysis tool and performance tool.
    B. A Defect Management tool, static analysis tool and code coverage tool.
    C. A Test Management tool, defect management tool and static analysis tool.
    D. A Test Management tool, defect management tool and code coverage tool

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only ISTQB exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your ISTQB-CTAL-TM exam preparations and ISTQB certification application, do not hesitate to visit our Vcedump.com to find your solutions here.