Skip to main content

D-VXB-DY-A-24 Real Exam Questions

Dell VxBlock Deploy Achievement

76 questions available · Page 1 of 8

Updated Exam DumpsVerified AnswersPass Guarantee

Get Complete Exam Dumps
Question 1 Single choice

Which required NSX component abstracts the physical network and provides access-level switching in the hypervisor?

  1. A

    Edge Services Gateway

  2. B

    vSphere Distributed Switch

  3. C

    Distributed Logical Router

  4. D

    vSphere Standard Switch

Show answer and explanation

Correct answer: C

Question 2 Single choice

A customer has a physical server connected to an ACI fabric. The server was recently moved to a different leaf switch within the ACI fabric. The IP address of this server was also changed but is still part of its original EPG.

What is a consideration once the correct port configuration is pushed from the APIC?

  1. A

    The host must be removed, and the connections need to be re-assigned.

  2. B

    No configuration changes are required on the ACI fabric.

  3. C

    The switch must be moved with the machine to the new site.

  4. D

    The contract needs to be updated to reflect the new IP address.

Show answer and explanation

Correct answer: B

Question 3 Drag & drop

DRAG DROP

Match each role to its responsibility.

Question diagram
Show answer and explanation
Correct answer diagram
Question 4 Single choice

Which document provides a representation of all the connections on the recently upgraded switch?

  1. A

    Port Map

  2. B

    Switch Administration Guide

  3. C

    Solutions Abstract

  4. D

    Switch Release Notes

Show answer and explanation

Correct answer: A

Question 5 Single choice

What is the main advantage of separating the network control plane from the data plane in a Software Defined Network?

  1. A

    Rapid provisioning and decommissioning of network devices and resources

  2. B

    Reduces the complexity of human intervention and potential errors

  3. C

    Addresses security concerns and management complexity

  4. D

    Programmatic control over both physical and virtual network devices

Show answer and explanation

Correct answer: D

Question 6 Single choice

Which component is NOT part of the Cisco Application Centric Infrastructure?

  1. A

    NSX Manager

  2. B

    ACI Policy Model

  3. C

    Application Policy Infrastructure Controller

  4. D

    Nexus 9000 Series Switches

Show answer and explanation

Correct answer: A

Question 7 Single choice

A System Engineer is validating system cabling for a VxBlock 1000. They find that some ports on Fabric Interconnects 1A are not connected.

Which connections are missing?

  1. A

    Network uplinks to Nexus switches

  2. B

    Network uplinks to the customer network

  3. C

    SAN uplinks to MDS switches

  4. D

    Server uplinks to C-Series servers

Show answer and explanation

Correct answer: D

Question 8 Single choice

What VMs are part of VxBlock Central?

  1. A

    Multi-system Prepositioning (MSP), Element Manager, ESRS

  2. B

    ESRS, Element Manager, Core

  3. C

    Core, Multi-system Management (MSM), Multi-system Prepositioning (MSP)

  4. D

    Element Manager, Multi-system Management (MSM), Multi-system Prepositioning (MSP)

Show answer and explanation

Correct answer: C

Question 9 Single choice

What is needed to provide network isolation between vSwitch port groups?

  1. A

    Uplink port

  2. B

    Separate VLAN IDs

  3. C

    VMKernel port

  4. D

    Shared VLAN ID

Show answer and explanation

Correct answer: B

Question 10 Single choice

Which document contains all software baseline information post-RCM upgrade?

  1. A

    LCS

  2. B

    MSP

  3. C

    SCR

  4. D

    Assessment Workbook

Show answer and explanation

Correct answer: A