D-VXB-DY-A-24 Exam Details

  • Exam Code
    :D-VXB-DY-A-24
  • Exam Name
    :Dell VxBlock Deploy Achievement
  • Certification
    :EMC Certifications
  • Vendor
    :EMC
  • Total Questions
    :76 Q&As
  • Last Updated
    :Jul 08, 2026

EMC D-VXB-DY-A-24 Online Questions & Answers

  • Question 61:

    Which required NSX component abstracts the physical network and provides access-level switching in the hypervisor?

    A. Edge Services Gateway
    B. vSphere Distributed Switch
    C. Distributed Logical Router
    D. vSphere Standard Switch

  • Question 62:

    During which phase of the RCM Upgrade process is the customer required to maintain configuration lock?

    A. Upgrade
    B. Kick-off
    C. Planning
    D. Executing and Controlling

  • Question 63:

    Refer to the exhibit.

    A cable with the following label was connected to the wrong equipment type:

    *

    M91A-01:01 U61A-01:09

    Based on the exhibit, what is the target equipment type?

    A. Nexus 9xxx, Slot A, Port1
    B. UCS 5108 Chasses A, Slot 1, Port 9
    C. MDS 9xxx, Slot 1, Port 1
    D. UCS 6xxx FI, Uplink A, Slot 1, port 9

  • Question 64:

    What is the recommended source to download a Test Plan for a specific VxBlock model?

    A. https://cpsdocs.dellemc.com/
    B. https://vce.flexnetoperations.com
    C. DellEMC Support
    D. SolVe Online

  • Question 65:

    A VxBlock 1000 system is being deployed at a customer site. The system is equipped with a Nexus 93180YC aggregation switch to support routing features. A Juniper switch is used at the customer site as the core switch. The customer intends to run a dynamic routing protocol between the Nexus and Juniper switches.

    Which routing protocol is recommended?

    A. EIGRP
    B. IGMP
    C. IGRP
    D. OSPF

  • Question 66:

    What is the standard expected timeline to complete an RCM upgrade?

    A. 2 months
    B. 8 business days
    C. 6 weeks
    D. 3 weeks

  • Question 67:

    What is encapsulated by a VxLAN?

    A. Layer 2 Ethernet frames in Layer 3 UDP-IP packets
    B. Layer 3 Ethernet frames in Layer 2 UDP-IP packets
    C. Layer 3 UDP-IP packets in Layer 2 Ethernet frames
    D. Layer 2 UDP-IP packets in Layer 3 Ethernet frames

  • Question 68:

    In addition to the Final Test Plan and Customer Satisfaction Survey, what document/form is required to be signed by the customer at the Project Closure Meeting?

    A. Milestone Completion Form
    B. Final Project Signoff
    C. Project Workbook
    D. Project Feedback Form

  • Question 69:

    Which component is NOT part of the Cisco Application Centric Infrastructure?

    A. NSX Manager
    B. ACI Policy Model
    C. Application Policy Infrastructure Controller
    D. Nexus 9000 Series Switches

  • Question 70:

    DRAG DROP

    Based on the Dell EMC RCM Workbook upgrade plan, in what sequence should VxBlock components be upgraded?

    Select and Place:

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only EMC exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your D-VXB-DY-A-24 exam preparations and EMC certification application, do not hesitate to visit our Vcedump.com to find your solutions here.