The objective of the MRP is to have:
A. Material available when it is needed and not before
B. Orders for material should not be released until the planned order release date arrived
C. Order should not normally released until the planned order is in the current week
D. All of the above
Which of the following is the right calculation for obtaining the net requirements?
A. Gross Requirement - Available inventory
B. Gross Requirement x Available inventory
C. Gross Requirement / Available inventory
D. None of the above is true
If there are 20 as in stock, only 30 needs to be made, then the requirements for components parts would be:
A. Reduced accordingly
B. Increased accordingly
C. Added accordingly
D. Both B and C
The process of placing the exploded requirements in their proper periods based on lead time is called
A. Offsetting
B. Exploding the equipments
C. Production plan
D. Where-used reports
Exploding is the process of multiplying the requirements by:
A. The usage quantity
B. By recording the appropriate requirements throughout the product tress
C. Both A and B
D. None of the above
Which of the following are the purposes of material requirement planning so items in the master production schedule are made on time?
A. To determine the components needed
B. To determine the quantities
C. To determine the due dates
D. All of the above
Which of the following defines what materials have to be scheduled to make the end products?
A. Bills of material
B. Master production schedule
C. Engineering change control bill
D. All of the Above
Following figure shows: (draw here figure 4.10) with out mentioning names)
A. Pegged requirement
B. Where-used reports
C. Production requirements
D. Summarized part lists
Product design engineers sometimes change the design of a product and the components used. These changes must be recorded and controlled. The bill provides the method for doing so is called
A. Engineering change control
B. Production change control
C. Demand change control
D. Both A and B
A listing of all the parents in which a component is used is called
A. Pegging report
B. Where-used report
C. Planning bill
D. Both A and B
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only APICS exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CPIM-MPR exam preparations and APICS certification application, do not hesitate to visit our Vcedump.com to find your solutions here.