APICS CPIM-MPR Online Questions & Answers

  • Question 1:

    A tool to map and understand the flow of materials from supplier to customer, focusing on not only understanding the current state of process and flow but also specifying the value-added and non- value-added time of all process steps, is called_____________________

    Correct Answer. Value stream mapping

  • Question 2:

    The operation that controls the work feeding the bottleneck and must operate at a rate equal to the utput of the bottleneck so the time buffer queue is maintained is known as:

    A. gateway operation
    B. bottleneck operation
    C. task operation
    D. Control buffer operation

  • Question 3:

    A facility, function, department, or resource whose capacity is equal to or less than the demand placed upon it is known as:

    A. timeframe
    B. bottleneck
    C. elapsed operation
    D. none of the above

  • Question 4:

    The time needed to unload and load must be shorter than .

    A. run time per piece
    B. planning time
    C. manufacturing time
    D. resource utilization time

  • Question 5:

    Operational splitting is practical when:

    A. setup time is low compared to run time
    B. a suitable work center is idle
    C. it is possible for an operator to run more than one machine at a time
    D. All of the above

  • Question 6:

    If the run time per piece on operation B is shorter than that on A, the first batch must be larger enough to avoid idle time on operation A

    A. True
    B. False

  • Question 7:

    Backward scheduling is used to determine when an order must be started.

    A. True
    B. False

  • Question 8:

    When the last operation is on the routing is scheduled first and is scheduled for complete at the due date, this is called:

    A. Timid scheduling
    B. Rearward scheduling
    C. Self-assistant scheduling
    D. Backward scheduling

  • Question 9:

    What is used to calculate how long it will take to complete a task?

    A. Forward scheduling
    B. Finite scheduling
    C. Self-assured scheduling
    D. Bold scheduling

  • Question 10:

    The length of time from when material enters a production facility until it exists, this is known as:

    A. throughput time
    B. workforce time
    C. creation time
    D. assembly time

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only APICS exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CPIM-MPR exam preparations and APICS certification application, do not hesitate to visit our Vcedump.com to find your solutions here.