MB7-849 Exam Details

  • Exam Code
    :MB7-849
  • Exam Name
    :NAV 2009 Manufacturing
  • Certification
    :Microsoft Certifications
  • Vendor
    :Microsoft
  • Total Questions
    :50 Q&As
  • Last Updated
    :Dec 09, 2021

Microsoft MB7-849 Online Questions & Answers

  • Question 41:

    After a production order is manually created, how can a production planner determine whether the component items are available? Choose the 2 that apply.

    A. Execute the Calculate Plan function from Order Planning.
    B. Review the Production Order Components window.
    C. Review the Item Substitution window.
    D. Review the Prod. Order - Shortage List report.

  • Question 42:

    Production order statistics can be used to review actual and expected costs and capacity. What costs can be reviewed in production order statistics? Choose the 3 that apply.

    A. Subcontracted cost
    B. Capacity cost
    C. Opportunity cost
    D. Material cost

  • Question 43:

    The Production Journal performs many of the same functions as the Consumption and Output Journals. How does the Production Journal differ from the Consumption and Output Journals? Choose the 3 that apply.

    A. When a user closes the Production Journal without posting the changes, a request message is displayed allowing the user to stay in the journal.
    B. Production journals are opened directly from a Planned Production Order line and preset with the relevant data.
    C. Quantities and times already posted for the production order are displayed at the bottom of the journal as actual entries.
    D. Production journals display operations and components together in a logical structure that provides an overview of the production process.

  • Question 44:

    The Routing Sheet report can be used to verify accuracy of routings or as a basis for new routings or versions. When printing, what additional information can be selected to print on the report? Choose the 3 that apply.

    A. Comments
    B. Tools
    C. Personnel
    D. Components

  • Question 45:

    You are a technical support specialist for Microsoft Dynamics NAV 2009.The production planner for one of your clients contacts you regarding a planning problem with a particular finished good. The planner explains that for a recently modified production BOM, the planning results are incorrect. You determine that the production BOM for the finished good was recently modified to include an additional level; afterwards, the status was updated to certified. You also confirm with the client that the Dynamic Low Level Code check box is not selected in Manufacturing Setup. Based on your conversation, what is the first step you have the planner perform to properly plan the finished good?

    A. Run the Calculate Regenerative Plan function.
    B. Run the Refresh function.
    C. Run the Calculate Low Level Code function.
    D. Run the Calculate Net Change Plan function.

  • Question 46:

    What status codes are available for production orders?

    A. Simulated, Planned, Released, Finished
    B. Planned, Firm Planned, Released, Finished
    C. Simulated, Planned, Firm Planned, Released, Finished
    D. Simulated, Planned, Firm Planned, Released, Completed

  • Question 47:

    What Replenishment System(s) are available for selection on a Stockkeeping Unit Card?

    A. Purchase
    B. Purchase, Production Order
    C. Purchase, Production Order, Transfer
    D. Purchase, Production Order, Transfer, Positive Adjustment

  • Question 48:

    The setup for subcontract work centers is similar to regular work centers, with some notable exceptions. What is the typical setup for subcontract work centers? Choose the 2 that apply.

    A. The Get Cost from PO check box is selected.
    B. The Unit Cost Calculation field is set to Units.
    C. A vendor is selected in the Subcontractor No. field.
    D. The vendor option is selected in the Source field.

  • Question 49:

    The overall purpose of MRP is to provide time-phased formal plans, by item, to supply the right item at the right time, in the right place, and in the right quantity. MRP uses action messages to tell the user what must be done to meet demand. What action messages are displayed in the planning worksheet? Choose the 3 that apply.

    A. Create a new order.
    B. Cancel an order.
    C. Finish an order.
    D. Change an order (quantity, timing).

  • Question 50:

    When a production order is released, certain conditions must be met for all of the components to be automatically consumed from inventory. What conditions must be met? Choose the 3 that apply.

    A. Forward has been selected as the flushing method on all components.
    B. The inventory is on hand.
    C. There are no routing link codes assigned.
    D. Forward has been selected as the flushing method on the finished good.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Microsoft exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your MB7-849 exam preparations and Microsoft certification application, do not hesitate to visit our Vcedump.com to find your solutions here.