Microsoft MB7-849 Online Questions & Answers

  • Question 1:

    You are a consultant implementing Microsoft Dynamics NAV 2009.You guided your client through the steps to populate a Planning Worksheet using the MPS selection for the Calculate Net Change Plan function. One of the lines populated in the worksheet has the MPS Order check box selected. Your client needs to generate the dependent requirements for the line.What function do you have your client perform next so that planning is complete for the line?

    A. Carry Out Action Message
    B. Explode Routing
    C. Run Planning with the MRP check box selected
    D. Refresh Planning Line with Backward flushing selected

  • Question 2:

    Microsoft Dynamics NAV 2009 handles both productive and non-productive throughput time. What types of non-productive time are supported? Choose the 3 that apply.

    A. Wait time
    B. Setup time
    C. Move time
    D. Queue time

  • Question 3:

    What report is used to show a detailed listing of the costs for each operation and component for selected production orders?

    A. Prod. Order - Calculation
    B. Prod. Order - List
    C. Prod. Order - Detailed Calc.
    D. Prod. Order - Precalc. Time

  • Question 4:

    You are a technical support specialist for Microsoft Dynamics NAV 2009.You receive a call from a client requesting assistance with production BOMs. Your client has an existing BOM for a finished good. For a set period of time, your client wants to include an additional component when producing the finished good.What advice do you give your client to handle the additional component for the finished good?

    A. Create a second production BOM that includes the component, and then enter the Starting Date and Ending Date in the header.
    B. Create a production BOM version that includes the component, and then enter the Starting Date and Ending Date in the header.
    C. Add the component to the lines of the existing BOM, and then select the Verify Component check box to allow the user to determine whether the component is included when the Refresh function is executed.
    D. Add the component to the lines of the existing BOM, and then specify the Starting and Ending Date on the line.

  • Question 5:

    In Manufacturing Setup, you can specify dampeners to suppress action messages during planning. Dampeners are available for both time and quantity (a percentage of the lot size).For what changes can dampeners result in an action message not being generated after a sales order is updated? Choose the 2 that apply.

    A. Changing the shipment date.
    B. Changing the shipment date to a future date.
    C. Changing the quantity.
    D. Changing the quantity to a lesser amount.

  • Question 6:

    When you manually enter a production order, prior to executing the Refresh function, what information must you enter? Choose the 3 that apply.

    A. Routing
    B. Quantity
    C. Due Date
    D. Source type (item, family, or sales header)

  • Question 7:

    Given the following setup:

    -

    A shop calendar with working days of 15 hours per day, seven days per week.

    -

    A painting work center with capacity of 1, efficiency of 100, and the unit of measure set to minutes. The shop calendar is linked to the work center.

    -

    A painting robot machine center with capacity of 2 and efficiency of 100. The work center is selected on the machine center. What is the capacity per day when the machine center calendar is calculated?

    A. 15
    B. 30
    C. 900
    D. 1,800

  • Question 8:

    You are the consultant on a Microsoft Dynamics NAV 2009 implementation. You are reviewing Manufacturing Setup, explaining the purpose of the various fields to your client. What explanation do you provide for the use of the Dampener (Time) and Dampener (% of Lot Size) fields?

    A. They limit Move suggestions for routing a Released Production Order.
    B. They limit Setup Time on a Released Production Order when the Refresh function is executed.
    C. They limit Action Messages when a plan is executed in Microsoft Dynamics NAV.
    D. They limit the production orders to include when a plan is executed in Microsoft Dynamics NAV.

  • Question 9:

    For a production BOM, all of the components are set up to forward flush, and there are no routing link codes. During which activity are the expected components consumed from inventory?

    A. When the production order status is changed to released.
    B. When the Consumption Journal is posted.
    C. When the first operation is posted in the Output Journal.
    D. When the Explode Routing function is executed in the Output Journal.

  • Question 10:

    You are the consultant on a Microsoft Dynamics NAV 2009 implementation.You are assisting your client set up routings for manufacturing bicycles. For this particular bike, the frame is painted first and then the front and back wheel assemblies are completed simultaneously prior to the final assembly. Your client has set up the following routing lines. Operation Number Description 10 Painting 20 Front Wheel 30 Back Wheel 40 Final Assembly

    What entries must be made in the Next Operation No. and Previous Operation No. fields on the routing lines for parallel scheduling to occur?

    A. Painting - Next Operation No. = 20Front Wheel - Previous Operation No. = 10, Next Operation No. = 30Back Wheel - Previous Operation No. = 20, Next Operation No. = 40Final Assembly - Previous Operation No. = 30
    B. Painting - Next Operation No. = 40Front Wheel - Previous Operation No. = 10, Next Operation No. = 40Back Wheel - Previous Operation No. = 10, Next Operation No. = 40Final Assembly - Previous Operation No. = 10
    C. Painting - Next Operation No. = 20 and 30Front Wheel - Previous Operation No. = 10, Next Operation No. = 40Back Wheel - Previous Operation No. = 10, Next Operation No. = 40Final Assembly - Previous Operation No. = 20 and 30
    D. Painting - Next Operation No. = 20Front Wheel - Previous Operation No. = 10, Next Operation No. = 40Back Wheel - Previous Operation No. = 10, Next Operation No. = 40Final Assembly - Previous Operation No. = 30

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Microsoft exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your MB7-849 exam preparations and Microsoft certification application, do not hesitate to visit our Vcedump.com to find your solutions here.