  • Question 11:

    A stockkeeping unit (SKU) can be considered to be a location-specific Item Card. How are SKUs created? Choose the 2 that apply.

    A. Automatically when a new item is added and the Location Mandatory check box is selected in Inventory Setup.
    B. Manually by entering the information directly on a Stockkeeping Unit Card.
    C. For selected locations using the Create Stockkeeping Unit function from an Item Card.
    D. For selected locations using the Create function from the Stockkeeping Unit Card.

  • Question 12:

    You are a consultant implementing Microsoft Dynamics NAV 2009. You are explaining the concept of netting to your client's production planner. For this discussion, you and the planner have agreed to assume a production forecast of 500 bikes for a particular month. You then introduce two scenarios for sales orders for the bikes in that month. For the first scenario, orders are received for 400 bikes. For the second scenario, orders are received for 650 bikes. Based on the sales orders, the planner wants to know the impact the production forecast has on gross requirements. Considering sales orders, how does the production forecast affect gross requirements for each scenario?

    A. Scenario 1 = 100; Scenario 2 = 0
    B. Scenario 1 = 400; Scenario 2 = 650
    C. Scenario 1 = 500; Scenario 2 = 500
    D. Scenario 1 = 900; Scenario 2 = 1,150

  • Question 13:

    You are the consultant on a Microsoft Dynamics NAV 2009 implementation.You have worked with your client to set up items, production BOMs, and a production forecast. Sales orders have not been entered in the system and there is no inventory on hand. The bike item has an associated BOM. The purchased components include one saddle and one lamp per bike. In the production sales forecast, there is demand entered for a period of 100 bikes, 30 saddles, and no lamps. You have your client execute Calculate Regenerative Plan using MPS only (not MRP) in the Planning Worksheet. What results do you expect for the bike, saddle, and lamp?

    A. Bike = 100; Saddle = 0; Lamp = 0
    B. Bike = 100; Saddle = 30; Lamp = 0
    C. Bike = 100; Saddle = 100; Lamp = 100
    D. Bike = 100; Saddle = 130; Lamp = 100

  • Question 14:

    In Microsoft Dynamics NAV 2009, the Reorder Cycle can be set on each item. What is the typical relationship between item cost and reorder cycle?

    A. There is no relationship between item cost and reorder cycle.
    B. The higher the cost, the longer the reorder cycle.
    C. The higher the cost, the shorter the reorder cycle.
    D. The highest cost item has a reorder cycle of one day. Reorder cycles for the remaining items are calculated from this item.

  • Question 15:

    Microsoft Dynamics NAV 2009 supports phantom BOMs. What selection do you make in the Type field to enter a phantom BOM on a production BOM line?

    A. Item
    B. Phantom BOM
    C. Production BOM
    D. Component

  • Question 16:

    You are a technical support specialist for Microsoft Dynamics NAV 2009.Your client plans to use regenerative planning to create suggested orders for an item. Specifically, when the item has a quantity available less than 50, he or she wants

    an order suggested for 80. The item has been set up with a Replenishment System of Purchase and a Manufacturing Policy of Make-to-Stock. Your client is unsure of what entries to make in the Reordering Policy, Safety Stock Quantity,

    Reorder Point, and Reorder Quantity fields on the Item Card.

    What entries do you advise your client make in the fields on the Item Card?

    A. Reordering Policy = Maximum Quantity; Safety Stock = 0; Reorder Point = 50; Reorder Quantity =80
    B. Reordering Policy = Maximum Quantity; Safety Stock = 80; Reorder Point = 50; Reorder Quantity =0
    C. Reordering Policy = Fixed Reorder Quantity; Safety Stock = 0; Reorder Point = 50; Reorder Quantity = 80
    D. Reordering Policy = Fixed Reorder Quantity; Safety Stock = 80; Reorder Point = 50; Reorder Quantity = 0

  • Question 17:

    You are a technical support specialist for Microsoft Dynamics NAV 2009.One of your clients contacts you for assistance. Your client has entered firm planned production orders; the firm planned production orders include routings with operations that have a subcontractor work center assigned. Your client is running the Calculate Subcontracts function in the Subcontracting Worksheet; however, lines are not populating in the worksheet. What step do you recommend to your client so that lines can be populated in the subcontracting worksheet?

    A. Enter Purchase Orders for the subcontractors.
    B. Run the Calculate Plan function in the Requisition Worksheet.
    C. Change the status of the Firm Planned Production Orders to Released.
    D. Refresh the Firm Planned Production Orders.

  • Question 18:

    Microsoft Dynamics NAV 2009 supports manual and automatic flushing. What information is updated as a result of flushing? Choose the 3 that apply.

    A. Materials consumed
    B. Quantities produced
    C. Time spent
    D. Production order status

  • Question 19:

    What is the purpose of the Matrix per Version window?

    A. To view components for all of the existing versions of a production BOM.
    B. To view steps for all of the existing versions of a routing.
    C. To view all of the production orders created for a version of a production BOM.
    D. To enter multiple versions of a production BOM.

  • Question 20:

    To use put-away features, a production manager must first create an inbound warehouse request for a released production order. How can an inbound warehouse request be created? Choose the 2 that apply.

    A. By selecting the Create Inbound Request check box on the Replan batch job.
    B. By selecting the Create Inbound Request check box on the Refresh batch job.
    C. By running the Create Inbound Whse. Request function from the production order.
    D. By running the Create Transfer Order function from the production order.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Microsoft exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your MB7-849 exam preparations and Microsoft certification application, do not hesitate to visit our Vcedump.com to find your solutions here.