  • Question 21:

    A company produces paints and assembles bicycle frames.

    You must account for paint drying time before assembly operations can begin.

    You need to set up the operation to encompass queue times.

    Which two options can you use? Each correct answer presents pad of the solution.

    NOTE: Each correct selection is worth one point.

    A. Build capabilities for each resource related to color.
    B. Enter a value in the queue time after field for the painting operation.
    C. Enter a value in the transit time on the painting operation.
    D. Make a resource group for each size and color and assign that group to the operation.
    E. Enter a value in the queue time before field for the assembly operation.

  • Question 22:

    DRAG DROP

    A glass bottle manufacturer uses route operations to schedule resources and track manufacturing costs.

    The company has recently seen an increase in demand and purchases another resource that costs more to run. The company uses the same costs per resource. The company must be able to track cost contributions for the new resource.

    You need to create a cost category for the new resource.

    Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

    NOTE: More than one order of answer choices is correct You will receive credit for any of the correct orders you select.

    Select and Place:

  • Question 23:

    HOTSPOT

    A company makes engine parts used in the automotive industry.

    They are in the process of retooling an existing manufacturing plant.

    They are looking to use Dynamics 365 for Finance and Operations to help support the Bill of Materials (BOM) product lifecycle for engineering version control.

    You must translate existing production processes into the proper elements.

    You need to create BOM lifecycle states to translate existing production processes into the proper elements.

    What type of BOM product lifecycle state should you create? To answer, select the appropriate BOM state in the answer area.

  • Question 24:

    A company uses Dynamics 365 Supply Chain Management for Process manufacturing.

    You are reviewing the planned production orders for the next two weeks.

    There are several production orders for the same product. One order is scheduled to run the week after another order.

    You need to optimize the planned production orders.

    What should you do?

    A. In Planned orders, combine the production orders.
    B. Rerun master planning. Select the dynamic plan with a coverage time fence of two weeks.
    C. Firm the orders.
    D. Rerun master planning. Select the static plan with a coverage time fence of two weeks.

  • Question 25:

    A company uses Dynamics 365 Supply Chain Management. Equipment installations in multiple regional locations require monthly maintenance.

    Two maintenance technicians have holiday time off scheduled this month.

    You need to ensure that all scheduled work orders are completed within the month around the holiday schedules.

    Which feature should you use?

    A. Activity-based subcontracting
    B. Job scheduling
    C. Capacity load calculation
    D. Operations scheduling
    E. Planning optimization

  • Question 26:

    A company uses Dynamics 365 Supply Chain Management. Due to supply chain disruptions, the bill of materials (BOM) for finished goods needs substitute products and subcomponent redesigns. The engineering team must update the product designs and release them to the company. The products already exist and are not currently set up for version control on transactions.

    You must configure the solution.

    Which three actions should you perform? Each correct answer represents a partial solution.

    NOTE: Each correct selection is worth one point.

    A. Enable version tracking on transactions.
    B. Run the Convert to engineering product wizard.
    C. Use the automation solution template.
    D. Enable engineering change management.
    E. Enable change management on existing products.

  • Question 27:

    HOTSPOT

    You are developing a new car audio system kit. The kit configuration has restrictions based on car model, speaker size, and other expression constraints.

    You need to set up a new item for the car audio system.

    How should you create the new product? To answer, select the appropriate option in the answer area.

    NOTE: Each correct selection is worth one point.

  • Question 28:

    DRAG DROP

    A manufacturing company is in the process of implementing Dynamics 365 Supply Chain Management.

    Typically, bill of materials (BOM) calculations are based on the item cost price. However, for a specific subset of items, the trade agreement price must be used.

    If a trade agreement does not exist, the purchase price should be applied instead.

    You need to configure BOM calculations for these items using the fewest possible configurations.

    Which configurations should you select for each requirement?

    To answer, drag the appropriate configurations to the corresponding requirements. Each configuration may be used once, multiple times, or not at all.

    Note: Each correct selection is worth one point.

    Select and Place:

  • Question 29:

    You produced 100 units of finished goods, but the material used was equivalent to the amount required for 105 finished goods. The company needs to track material variances compared to the original estimates, and only one picking list journal can be used for each production order.

    You must post a picking list that reflects the material required for 105 finished goods.

    What actions should you take?

    A. When creating the lines for a picking list, select the estimated consumption option and override the consumption field with the actual amount to be consumed.
    B. Increase the production order to a total quantity of 105 and re-estimate.
    C. Report as finished five additional units into the good quantity and post a picking list for only the originally estimated amount.
    D. In the Bill of materials production details, edit the estimated amount for each line to equal 105 units of raw material.

  • Question 30:

    A company uses engineering change management for process manufacturing operations. During the product lifecycle, the company discovers that several products were configured with missing master data.

    You must set up master data checks for these products.

    Which three objects can be configured for data checks? Each correct answer provides a complete solution.

    NOTE: Each correct selection is worth one point.

    A. standard, non-engineering products
    B. product formulas
    C. product BOM lines
    D. engineering products
    E. product versions

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Microsoft exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your MB-335 exam preparations and Microsoft certification application, do not hesitate to visit our Vcedump.com to find your solutions here.