HOTSPOT
You are a manufacturing consultant helping a client test out different bill of material (BOM) and route consumption options when starting production orders. Material and labor consumption are to be completed before Report as finish.
You are running a production order with BOM lines that have a Flushing principle set to Start. The Automatic Route Consumption Runtime has been set to Yes.
You have set up the default Start user options for all production orders as shown in the exhibit below.


DRAG DROP
You are the product design manager for a computer manufacturer.
Your new laptop model is configurable.
There are restrictions on which hardware components can be selected depending on the model. You create configuration groups for hardware and software.
You need to create a new laptop item number and configurations.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
Select and Place:

Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A client subcontracts production work to a vendor for production operations.
You need to model subcontracting of route operations in production orders.
Solution: Ensure that the material routing process is independent of the services procurement process.
Does the solution meet the goal?
A. YesYou need to create the constraint for the ML seat selection.
Which expression constraint should you use?
A. Implies[Trim==Legend,Seat==ML]HOTSPOT
A company implements Dynamics 365 Supply Chain Management.
You run a master plan each week.
You need to resolve the issue in the scenario.
What should you do? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

You need to resolve the ModelA charging issue.
Which two configurations should you set on the work order finite capacity?
NOTE: Each correct selection is worth one point.
A. Ignore scheduled executionDRAG DROP
A company uses Process manufacturing and needs to review formulas to understand how different ingredient types affect the batch balancing process.
Which ingredient types should you use? To answer, drag the appropriate ingredient types to the correct scenarios. Each ingredient type may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place:

Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean process. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
1. Create a vendor warehouse for the subcontracting vendor
2. Create a vendor resource and add it to a new work cell for outsource painting
3. Create a production flow transfer activity and specify the vendor warehouse as the target warehouse
Does this solution meet the goal?
A. YesHOTSPOT
A company uses Dynamics 365 Supply Chain Management and plans to implement the Asset management module to maintain its collection of milling machine fixtures.
The module must be set up to meet the following requirements:
1. Conduct regular oil sampling for each machine.
2. Manage all calibration types-including tooling, instrumentation, and tolerances-that require the same performance skillset as a group.
3. Outsource preventive maintenance for pneumatic tapping machines due to a lack of in-house skills.
4. Schedule all maintenance activities simultaneously to maximize efficiency and minimize costs.
You need to configure the system to fulfill these requirements.
Which option should you configure to achieve this? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

You are the lead product design engineer at a plastics manufacturing company.
You implement a new process that uses a single to produce three finished at the same time.
You need to set up the planning items number and formula to correctly to manufacturing the tree items.
Which three actions should you perform? Each correct answer presents part of the solution.
A. Create item number for planning item and the associated formula.Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Microsoft exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your MB-335 exam preparations and Microsoft certification application, do not hesitate to visit our Vcedump.com to find your solutions here.