D-PSC-MN-01 Exam Details

  • Exam Code
    :D-PSC-MN-01
  • Exam Name
    :Dell GenAI Foundations Achievement
  • Certification
    :EMC Certifications
  • Vendor
    :EMC
  • Total Questions
    :101 Q&As
  • Last Updated
    :Jul 15, 2026

EMC D-PSC-MN-01 Online Questions & Answers

  • Question 1:

    Which two backend switches support 100 GbE?

    A. DCS-7308
    B. S5232-ON
    C. 29264-ON
    D. D4040

  • Question 2:

    Which statement is accurate regarding Dell EMC PowerScale hardware platforms?

    A. Gen 6 node hardware comes only in 4U rack-mountable chassis.
    B. Gen 6.5 F200 nodes come in 4U rack-mountable chassis.
    C. Gen 6 node hardware comes in 2U or 4U rack-mountable chassis.
    D. Gen 6.5 F600 nodes can only be added as node pairs.

  • Question 3:

    A PowerScale customer is planning to expand a Dell EMC PowerScale Gen 5 cluster with H500 nodes. What is a consideration?

    A. Minimum of three Gen 6 nodes are needed.
    B. Backend is not supported.
    C. Only Gen 5 nodes can be added to the cluster.
    D. Minimum of four H500 nodes are needed.

  • Question 4:

    What type of upgrade on a Dell PowerScale cluster requires the least amount of time?

    A. Simultaneous
    B. Parallel
    C. Rolling
    D. Automatic

  • Question 5:

    What type of upgrade on a Dell EMC PowerScale cluster requires rebooting of all nodes at the same time?

    A. Simultaneous
    B. Rolling
    C. Side-by-side
    D. In-place

  • Question 6:

    Which model is a part of the Isilon Gen6 platform?

    A. F600
    B. F810
    C. F900
    D. F200

  • Question 7:

    A platform engineer has added an F200 node to a Dell EMC PowerScale cluster. The cluster now has five F200 nodes. Before leaving the site, what action must the engineer perform?

    A. Verify the node LNN is set to 1
    B. SmartFail the node and rejoin the cluster
    C. Reboot the node and wait for a green status
    D. Ensure the install base record is updated

  • Question 8:

    An implementation engineer is connecting new Dell EMC PowerScale F600 nodes to the backend. What network speeds are supported for the backend?

    A. 10 GbE or 40 GbE
    B. 10 GbE or 25 GbE
    C. 25 GbE or 100 GbE
    D. 25 GbE or 40 GbE

  • Question 9:

    An engineer wants to create a 4-node cluster after rack and stack. What port must they use to start the installation?

    A. COM
    B. FE
    C. BE
    D. iDRAC

  • Question 10:

    A platform engineer does not have a Flash drive available. How can they reimage a Dell PowerScale node?

    A. Copy the OneFS install file to the node and run the isi_reimage command.
    B. Copy the OneFS install file onto CD and install from CD.
    C. Use a serial connection to run the installation from a laptop.
    D. Copy the OneFS install file to the node and run the isi diskutil command.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only EMC exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your D-PSC-MN-01 exam preparations and EMC certification application, do not hesitate to visit our Vcedump.com to find your solutions here.