SAP C_TSCM42_67 Online Questions & Answers

  • Question 71:

    A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order. The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.

    What do you have to consider for the two lists at this stage? (Choose two)

    A. The stock/requirements list was updated the moment it was accessed.
    B. The MRP list displays the production order.
    C. The MRP list has the status "processed".
    D. The stock/requirements list displays the production order.

  • Question 72:

    Which of the following properties applies to multi-site planning in SAP ECC?

    A. When using one-step stock transfer posting, transfer stock is created in the receiving plant.
    B. Multi-site planning can be activated using the corresponding planning strategy.
    C. Both withdrawal from an alternative plant and stock transfer from another plant are defined via special procurement keys.
    D. The use of "scope of planning" is always mandatory for multi-site planning.

  • Question 73:

    What could be a consequence of confirming an operation?

    A. The planned costs are updated
    B. The capacity requirements are updated
    C. The production order is rescheduled
    D. The actual costs are settled

  • Question 74:

    Which of the following scheduling types can only be used in capacity planning?

    A. Midpoint
    B. Forward
    C. Only capacity requirements
    D. Backward

  • Question 75:

    Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?

    A. Lead time scheduling cannot take place.
    B. Dependent requirements request the components from the bill of materials at wrong times when using basic dates scheduling.
    C. Requirements planning creates an appropriate exception message in basic dates scheduling.
    D. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.

  • Question 76:

    Which objects can affect the calculation of capacity requirements for an operation? (Choose three)

    A. Standard values (routing)
    B. In-house production time (material master)
    C. Transport time (routing)
    D. Formulas (work center)
    E. Operation control key (routing)

  • Question 77:

    Which of the following statements is true for the ATP (available to promise) availability check in SAP ECC that is triggered from a customer order?

    A. The ATP check does not confirm against stocks and receipts, it checks consumption against planning requirements.
    B. An availability check by means of ATP creates fixed links between customer orders and their confirmed receipts.
    C. The ATP quantity is the quantity still available that can be used to confirm incoming customer orders.
    D. If the ATP check establishes non-availability, it checks whether it is still possible to procure or produce in time.

  • Question 78:

    Which of the following statements about the planning functions available in SAP ECC is correct?

    A. Master production scheduling (MPS) refers to preferred planning of important materials.
    B. Material requirements planning (MRP) includes automatic capacity leveling.
    C. Long-term planning (LTP) is a long-term form of forecast planning.
    D. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.

  • Question 79:

    What can you use to organize material staging for production orders? (Choose three) A. Material documents

    B. Transfer orders
    C. KANBAN
    D. Pull list
    E. Logistics Information System (LIS)

  • Question 80:

    In which scenario will the error message shown in the attached screenshot occur? Exhibit:

    Exhibit

    A. A valid routing exists, but the material master is set to manual routing selection.
    B. A valid routing exists, but the Customizing for the order type is set to manual routing selection.
    C. The routing is not valid at the explosion date.
    D. The selection method is set to "selection only by production version" in the material master.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TSCM42_67 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.