  • Question 31:

    Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting of the goods receipt?

    A. Set "Container in process"
    B. Set "Container empty"
    C. Set "Container in transport"
    D. Set "Container full"

  • Question 32:

    During the processing of production orders planned and actual costs are determined. On which of the following objects can you collect these costs? (Choose two)

    A. Production order
    B. Product cost collector
    C. Work center
    D. Planned order

  • Question 33:

    Which of the following structural elements does a process order have? (Choose three.)

    A. Item data
    B. Parallel sequences
    C. Relationships
    D. Phases
    E. Characteristic-based process instructions

  • Question 34:

    In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data:

    -Start: 7:00:00 a.m.

    -End: 3:00:00 p.m.

    -Break duration: 1 hour

    -Rate of utilization: 80%

    -Overload: 110%

    -

    Number of individual capacities: 1 How large is the standard available capacity?

    A. 8 hours
    B. 5.6 hours
    C. 6.16 hours
    D. 7 hours

  • Question 35:

    What is a feature of the simu-lation mode for material requirements planning in SAP ECC?

    A. It calculates the delay time which may occur in planning.
    B. It triggers multilevel bottom-up scheduling.
    C. It propagates exception messages from a component to the finished product.
    D. It posts planning results to the database automatically.

  • Question 36:

    You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity bottlenecks occur, you want to use a second sequence on other work centers for operations 30 and 40. Which sequence category do you use to create the second sequence in the system?

    A. Finish-start relationship
    B. Standard sequence
    C. Parallel sequence
    D. Alternative sequence

  • Question 37:

    You want to use the different options for planning in SAP ECC. What is the correct sequence of the planning procedures?

    A. Sales and operations planning -> Demand management -> Long-term planning -> Material requirements planning -> Capacity planning
    B. Demand management -> Sales and operations planning -> Capacity planning -> Long- term planning -> Material requirements planning
    C. Material requirements planning -> Demand management -> Sales and operations planning -> Long-term planning -> Capacity planning
    D. Long-term planning -> Sales and operations planning -> Demand management -> Material requirements planning -> Capacity planning

  • Question 38:

    Which of the following properties about the planning functions available in SAP ECC applies?

    A. Long-term planning (LTP) is a long-term form of forecasting.
    B. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.
    C. Material requirements planning (MRP) includes automatic capacity leveling.
    D. Master production scheduling (MPS) refers to preferred planning of important materials.

  • Question 39:

    The company you advise wants to control the availability check in so that when a production and/or process order is created, the following receipts or issues are taken into account: planned orders, purchase orders, production orders, reservations, dependent requirements. When the production and/or process order is released, only the stock that is currently freely usable should be taken into consideration. How can you fulfill this request?

    A. Differentiated assignment of two different checking rules in check control.
    B. Activate the freely usable stock in the scope of check.
    C. Enter an appropriate availability checking group in the material master.
    D. Enter an appropriate availability checking rule in the order type.

  • Question 40:

    What are the names of the objects for process integration of production orders? (Choose two)

    A. Control recipes
    B. Work instructions
    C. PI sheets
    D. Control instructions

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TSCM42_67 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.