  • Question 41:

    Which of the following activities is necessary for the capacity availability check that can be carried out automatically when a production order is released?

    A. Set the finite scheduling indicator and assign a checking rule in the work center for the operation to be checked.
    B. Activate the availability check and assign an overall profile in the checking control of the order type / plant combination.
    C. Assign an appropriate availability checking rule to the material master for the product.
    D. Activate the availability check and assign an overall profile in the production scheduling profile.

  • Question 42:

    You select the master data for production orders via production versions. Which information is contained in a production version?

    A. The explosion dates for the routing and BOM
    B. The routing and BOM alternatives to be used
    C. The default order type to be used
    D. The control parameters for selecting routings and BOM

  • Question 43:

    What can you use to organize material staging for production orders? (Choose three)

    A. Material documents
    B. Transfer orders
    C. KANBAN
    D. Pull list
    E. Logistics Information System (LIS)

  • Question 44:

    What functions can you use for sub operations? (Choose two)

    A. Costing
    B. Material component allocation
    C. Production/Resource tools allocation
    D. Capacity planning

  • Question 45:

    When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling. Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?

    A. Total planning online
    B. Multi-level single-item planning with the "display material list" option
    C. Interactive single-item planning for the delayed assembly
    D. Multi-level single-item planning with the "simulation mode" option

  • Question 46:

    Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus generate run schedule quantities (RSQ) from normal planned orders? (Choose three)

    A. Automatic selection of the production line assigned to the MRP group used during material requirements planning (MRP)
    B. Automatic selection of the production version in material requirements planning (MRP) using the selection methods setting
    C. Automatic selection of the production version by applying quota arrangement records in material requirements planning (MRP)
    D. A planning algorithm from capacity planning
    E. Manual assignment of planned production quantities in a planning table

  • Question 47:

    The availability check during production order creation should use a different scope of check than during order release. How can you fulfill this requirement?

    A. Maintain appropriate checking rules in checking control for order creation and order release.
    B. Maintain appropriate availability checking rules in the order type-dependent parameters.
    C. Maintain an appropriate availability checking group in the material master.
    D. Maintain appropriate availability checking rules in the production scheduling profile.

  • Question 48:

    In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data:

    -Start: 7:00:00 a.m.

    -End: 3:00:00 p.m.

    -Break duration: 1 hour

    -Rate of utilization: 80%

    -Overload: 110%

    -

    Number of individual capacities: 1 How large is the standard available capacity?

    A. 8 hours
    B. 5.6 hours
    C. 6.16 hours
    D. 7 hours

  • Question 49:

    The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order. However, a corresponding rescheduling exception message does not appear.

    What could be the reasons? (Choose two)

    A. The delta between the availability dates falls within the tolerance window defined in Customizing.
    B. The fixed planned order is outside the rescheduling horizon.
    C. Requirements planning has not been carried out.
    D. The MRP elements are linked via fixed pegging.

  • Question 50:

    The final assembly of a finished product should only be triggered when a customer order arrives. Which planning strategy for the finished product do you use?

    A. Planning with make-to-stock (strategy 10)
    B. Planning at the assembly level (strategy 70)
    C. Planning without final assembly (strategy 50)
    D. Planning with final assembly (strategy 40)

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TSCM42_66 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.