C_TSCM42_66 Exam Details

  • Exam Code
    :C_TSCM42_66
  • Exam Name
    :SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7
  • Certification
    :SAP Certifications
  • Vendor
    :SAP
  • Total Questions
    :80 Q&As
  • Last Updated
    :Aug 23, 2021

SAP C_TSCM42_66 Online Questions & Answers

  • Question 11:

    When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three)

    A. User-defined fields in the operation of routings
    B. General operation values of routings
    C. General item values of bill of materials
    D. General values from work scheduling view of the material master
    E. Standard values in the operations of routings

  • Question 12:

    A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order. The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.

    What do you have to consider for the two lists at this stage? (Choose two)

    A. The stock/requirements list was updated the moment it was accessed.
    B. The MRP list displays the production order.
    C. The MRP list has the status "processed".
    D. The stock/requirements list displays the production order.

  • Question 13:

    You want to use the function "Read PP master data" in the production order. However, while calling the function you receive an error message. What could be the reason?

    A. The material availability check has been performed.
    B. Goods movements have been posted.
    C. The production order has been released.
    D. Order papers have been printed.

  • Question 14:

    Which objects can affect the calculation of capacity requirements for an operation? (Choose three)

    A. Standard values (routing)
    B. In-house production time (material master)
    C. Transport time (routing)
    D. Formulas (work center)
    E. Operation control key (routing)

  • Question 15:

    Which of the following functions are available in SAP ECC when using capacity leveling? (Choose three)

    A. Batch size optimization
    B. Midpoint scheduling
    C. Lot size optimization
    D. Finite capacity scheduling
    E. Setup time reduction

  • Question 16:

    What data can be posted directly via the Plant Data Collection (PP-PDC) interface?

    A. Goods receipts
    B. Maintenance notifications
    C. Confirmations
    D. Goods issues

  • Question 17:

    Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting of the goods receipt?

    A. Set "Container in process"
    B. Set "Container empty"
    C. Set "Container in transport"
    D. Set "Container full"

  • Question 18:

    In what sequence are the steps of material requirements planning performed in SAP ECC?

    A. 1. Net requirements calculation 2. Lot sizing 3. Determination of the procurement type 4. Scheduling
    B. 1. Calculation of safety stock 2. Lot sizing 3. Scheduling 4. Determination of the procurement type
    C. 1. Availability check 2. Lot sizing 3. Determination of the procurement type 4. Scheduling
    D. 1. Net requirements calculation 2. Lot sizing 3. Scheduling 4. Determination of the procurement type

  • Question 19:

    What sequence do you follow in master data maintenance to define the production of a material?

    A. Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work center
    B. Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing
    C. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center
    D. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing

  • Question 20:

    Which Customizing element controls the determination of planned costs in production orders?

    A. Accounting type
    B. Costing variant
    C. Calculation procedure
    D. Settlement profile

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TSCM42_66 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.