  • Question 71:

    Which functions can be triggered before releasing a production order? (Choose three)

    A. Confirmation
    B. Selection of a routing
    C. Scheduling
    D. Stock determination
    E. Selection of a BOM

  • Question 72:

    What could be a consequence of the confirmation of an operation?

    A. Settlement of the actual costs
    B. Reduction of capacity requirements
    C. Rescheduling of the production order
    D. Update of the planned costs

  • Question 73:

    What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)

    A. Availability check
    B. Digital signature
    C. Resource selection
    D. Electronic batch record
    E. Approved master recipes

  • Question 74:

    What can you use to organize material staging for production orders? (Choose three)

    A. Transfer orders
    B. Logistics Information System (LIS)
    C. KANBAN
    D. Material documents
    E. Pull list

  • Question 75:

    You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity bottlenecks occur, you should be able to use a second sequence on other work centers for operations 30 and 40. What sequence category do you use to create the second sequence in the system?

    A. Substitute sequence
    B. Standard sequence
    C. Alternative sequence
    D. Parallel sequence

  • Question 76:

    Which of the following items of master data are needed for repetitive manufacturing? (Choose three)

    A. Product cost collector
    B. Repetitive manufacturing profile
    C. Production version
    D. Production supply area
    E. Master record for serial numbers

  • Question 77:

    For which of the following objects can you enter a confirmation? (Choose two)

    A. Production order
    B. Production order operation
    C. Trigger Point
    D. Work Center

  • Question 78:

    You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling). Which of the following statements is true for the resulting dependent requirements?

    A. When a customer order is created for the finished material, the dependent requirements are automatically triggered for the components in the bill of material without a planning run.
    B. In multi-level backward scheduling, dependent requirements are calculated to the exact second.
    C. In multi-level backward scheduling, dependent requirements are triggered at the start date for the planned order of the finished material.
    D. If the individual material components are explicitly assigned to the operations of a routing, the requirement dates of the dependent requirements are scheduled at each start date of the operations.

  • Question 79:

    In the SAP ECC system, a material is produced using production orders. The planning table of repetitive manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material (see attached screenshot).

    What could be the reason?

    A. The repetitive manufacturing indicator has not been set.
    B. There are no requirements present.
    C. There is no valid production version for this material.
    D. There are no planned orders or production orders present.

  • Question 80:

    An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials by default. However, some materials need to have a different planning horizon. What procedure do you recommend for setting the planning horizon?

    A. Set the planning horizon in the MRP groups in Customizing and assign variant entries via the plant parameter settings.
    B. Set the planning horizon in Customizing using the plant parameter settings and assign variant entries via the MRP groups for the corresponding materials.
    C. Set the planning horizon in the MRP groups in Customizing and store the variant values in the material masters for the corresponding materials.
    D. Set the planning horizon in the plant parameters in Customizing and store variant entries in the material masters for corresponding materials.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only SAP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your C_TSCM42_65 exam preparations and SAP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.