BICSI BICSI-RCDD Online Questions & Answers

  • Question 391:

    Dimmer switches are acceptable for use in a TR.

    A. True
    B. False

  • Question 392:

    A program is in its execution phase when a component project manager suggests a potential change that could increase the financial benefit of the program. The program manager is hesitant to submit a change request, as it would extend the program schedule and require a scope change.

    To whom should the change request be presented?

    A. The program governance board
    B. The program customer
    C. The program management office (PMO)
    D. The protect governance board

  • Question 393:

    The program manager compiles a program performance report for review by the program governance board. The performance report indicates that the scope, quality and schedule objectives have been me, but costs and resource utilization are higher than expected.

    The program can no longer deliver the planned return-on-investment within an acceptable level and the intended benefits have not yet been realized After further analysis of the performance indicators the program manager should do

    which of the following*?

    A. Extend the schedule to reduce costs and resource utilization
    B. Expand the scope and continue the program until return on investment objectives can be met
    C. Recommend cancellation of the program based on performance metrics
    D. Transition the existing program results to the appropriate operational area

  • Question 394:

    What's the RECOMMENDED twisted pair cable slack length to be left at the work area outlet location to enable the possibility of future changes in the Horizontal Cabling System?

    A. =0.152 m (0.5 ft)
    B. =0.3 m (1 ft)
    C. =1 m (3 ft)
    D. = 5m (16 40 ft)

  • Question 395:

    The American Public Works Association has adopted the color blue for warning tape used to minimize any chance of accidental dig-up of telecommunications and CATV cables.

    A. True
    B. False

  • Question 396:

    When estimating an ICT distribution designer project timeline schedule based on the scope of work

    which two scheduling methods use network diagrams lo integrate logical activities and identify critical paths on the project?

    (Select two options.)

    A. If This Then That (IFTT)
    B. Gantt Chart
    C. Work Breakdown Structure (WBS)
    D. Critical Path Method (CPM)
    E. Program Evaluation Review Technique (PERT)

  • Question 397:

    Information for locating underground utilities is generally classified into four quality levels. Which of the following quality levels match this description? (Involves actually locating by use of non-destructive vacuum excavation equipment, or other means, to expose buried utilities at critical points).

    A. B
    B. D
    C. A
    D. C

  • Question 398:

    In specifying labels and pruned tags that meet Underwriters Laboratories (UL) 969 Standard, marking and labeling systems are provided following the listed metrics.

    Which two of the following are REQUIRED for the UL standard?

    (Select two options.)

    A. Adhesion test
    B. Thickness test
    C. Texture test
    D. Durability test
    E. Visual inspection

  • Question 399:

    Communicating a project's design and technical specifications to the client and stakeholders is part of the ___________of the project.

    A. scope of work
    B. needs analysis
    C. close out procedure
    D. bidding phase

  • Question 400:

    What is the standard floor space allocation used in an office environment for one individual work area?

    A. 100 square feet.
    B. 50 square feet.
    C. 150 square feet.
    D. 75 square feet.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only BICSI exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your BICSI-RCDD exam preparations and BICSI certification application, do not hesitate to visit our Vcedump.com to find your solutions here.