BICSI BICSI-RCDD Online Questions & Answers

  • Question 381:

    A new component project is approved by the program governance board.

    The funding for this component project will be provided by an organization different from the organization funding the program Would this be an acceptable funding arrangement?

    A. Yes, only component projects may have different funding sources
    B. Yes, the program and its components may have different funding sources
    C. No. the program and the project must be funded by the same organization
    D. No. component projects must be funded by program funds

  • Question 382:

    A program in a matrix organization includes subprojects for specific required technologies. The program manager assembles a team of project managers to lead each of the component projects. Each component protect requires unique technical skills and expertise. To ensure that there are no budget overruns, the program manager leverages the existing time reporting process.

    What is a critical component of the Program Schedule Management Process?

    A. A list of all the projects that team members are working on
    B. Activity or component start and finish dates, as well as intermediate milestones
    C. Time management training programs for all team members, as well as the project managers
    D. Skill levels of the various project team members, as well as the project managers

  • Question 383:

    A program manager takes over a global program from another program manager. Upon arriving on-site, the program manager immediately sees that stakeholders are upset because of a lack of updates and communications about the program.

    What should the program manager do first?

    A. Review the program governance plan and communication log
    B. Review the program communications management plan and stakeholder register
    C. Review the stakeholder engagement plan and stakeholder matrix
    D. Notify the executive sponsor and update the program issue tog

  • Question 384:

    During the design phase, drawings for ICT communications spaces should be reviewed for Standards compliance and

    A. cost projections.
    B. OSHA specifications
    C. client requirements
    D. equipment availability

  • Question 385:

    What is the maximum pulling force guideline for a 2 or 4 strand fiber cable?

    A. 100 lbs
    B. 75 lbs
    C. 50 lbs
    D. 25 lbs

  • Question 386:

    What is the RECOMMENDED bend radius of a conduit with an internal diameter of 51 mm (2 in)?

    A. 203 mm (8 in)
    B. 305 mm (12 in)
    C. 406 mm (16 in)
    D. 508 mm (20 in)

  • Question 387:

    Program A is dependent upon program B lo complete benefits sustainment for two benefits Program A is on track to meet program benefits.

    However program B's program manager has just advised that program B has been closed.

    What should program A's program manager update and review first with the stakeholders?

    A. Benefits sustainment plan
    B. Benefits register
    C. Benefits management plan
    D. Benefits transition plan

  • Question 388:

    For optical fiber cabling,

    which of the following test instruments is used to locate and identify any anomalies?

    A. OTDR
    B. Optical power meter
    C. OLTS
    D. Spectrum analyzer

  • Question 389:

    Which two of the following roles do an ICT distribution designer use to ensure a timely and cost-effective telecommunications construction project? (Select two options.)

    A. Discuss design concerns with inspectors. AHJs, and other stakeholders.
    B. Verify that the overall physical security design complies with the owner expectations.
    C. Assist in the resolution of unforeseen conditions, change orders RFIs and changes to the project's critical path.
    D. Ensure the construction materials are stored properly and protected from theft.
    E. Coordinate electrical supply so it is available in advance of the starting of contractor work.

  • Question 390:

    What should be considered

    when designing a fiber network?

    A. Use a minimum of OM4 multimode fiber to future proof the design.
    B. Ensure that all connectors are backwards and forward compatible with all applications.
    C. Ensure the fiber strands provided are sufficient in quantity to accommodate all anticipated needs.
    D. Ensure that the single mode and multimode hybrid is recommended.
    E. Design only what you need for today to save money for future upgrades.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only BICSI exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your BICSI-RCDD exam preparations and BICSI certification application, do not hesitate to visit our Vcedump.com to find your solutions here.