BICSI BICSI-RCDD Online Questions & Answers

  • Question 361:

    What is the minimum recommended pressure for pressurized underground air-core cable?

    A. 3 psi
    B. 6 psi
    C. 1 psi
    D. 2 psi

  • Question 362:

    A program manager is assigned to a large cross-functional program trial includes five different technologies and multiple workstreams.

    Some potential stakeholders have conflicting program expectations

    What should the program manager do next/?

    A. Conduct interviews with key stakeholders, and document the results in the program management plan
    B. Update the stakeholder register to document stakeholders' positions relative to the program
    C. Document stakeholder expectations in the program's risk register to determine their influence
    D. Send out satisfaction surveys and document the results in the program's stakeholder engagement plan.

  • Question 363:

    You are designing distribution for a seven unit townhouse with in slab conduits.

    What is the MINIMUM number of 27 mm (1 in) rigid PVC Type 2 or metallic conduit that is required to satisfy distribution to each unit?

    A. Three
    B. Four
    C. Five
    D. Seven
    E. Fourteen

  • Question 364:

    In a computer or control room where the plenum is used for heating, ventilating, and air-conditioning, the finished floor height should be a minimum

    of how many inches?

    A. 8 inches.
    B. 12 inches.
    C. 2 inches.
    D. 6 inches.

  • Question 365:

    An insurance company launches a program to consolidate the multiple systems used by its agents.

    This program will benefit stakeholders by offering efficient policy administration processes, improved customer service and the ability to grow market share.

    However, since the new program will also introduce new policies and pricing controls, some stakeholders are opposed to its implementation To obtain consensus among stakeholders,

    what should the program manager do?

    A. Ensure that the program considers organizational change management and outreach efforts to help convey program benefits
    B. Identify stakeholders who are opposed to the program, and present them with the value of the program's benefits
    C. Create focus groups representing different types of stakeholders and then meet with them at the program planning stage to hear their concerns
    D. Ask the program sponsor to be the interface with stakeholders for all future communications

  • Question 366:

    The program manager wants to ensure that a program contributes to shareholder value.

    The program manager should verify alignment with which of the following?

    A. Program charter
    B. Organizational structures and policies
    C. Organizational strategic objectives
    D. Program governance plan

  • Question 367:

    A program completes all component projects and all identified benefits are being delivered.

    However, the program sponsor is concerned that long-term benefits may not meet organizational performance parameters To ensure the realization of long-term benefits

    what should the program manager use?

    A. Benefits register
    B. Benefits sustainment plan
    C. Benefits management plan
    D. Benefits transition plan

  • Question 368:

    During the program execution stage the component project manager responsible for testing estimates that budgeted hours may exceed 200 hours.

    What should the program manager do?

    A. Communicate to the program sponsor regarding the additional estimated cost and request a change order
    B. Determine which component protects have excess capacity and rebalance those resources to the project that needs additional hours
    C. Request that the project manager make the team members work additional hours and not bill the protect
    D. Talk with the project manager and find ways to reduce hours in another part of the project

  • Question 369:

    Which two of the following types of metallic conduit REQUIRE threaded couplings? (Select two options.)

    A. Electrical metallic tubing (EMT)
    B. Aluminum metal conduit (AMC)
    C. Flexible metal conduit (FMC)
    D. Intermediate metal conduit (IMC)
    E. Rigid metal conduit (RMC)

  • Question 370:

    For a building with up to 100,000 sq. ft.

    of usable floor space, what would be the minimum size of the back board, in an entrance facility, to accommodate up to 1200 copper pairs, protected and terminated in a manner suitable for cross-connection requirements?

    A. One 4 ft X 8 ft. X 3/4 inch plywood.
    B. One 2 ft X 4 ft. X 3/4 inch plywood.
    C. Two 4 ft X 8 ft. X 3/4 inch plywood.
    D. One 4 ft X 4 ft. X 3/4 inch plywood.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only BICSI exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your BICSI-RCDD exam preparations and BICSI certification application, do not hesitate to visit our Vcedump.com to find your solutions here.