  • Question 1:

    Your project has three issue types that share a common workflow.

    Which reason would make you recommend the implementation of separate workflows for each issue type?

    A. The issue types need different sets of priorities.
    B. Each issue type uses a different issue security level.
    C. Different project roles are working on the issue types.
    D. One of the issue types needs a new status.
    E. The issue types need different sets of resolutions.

  • Question 2:

    Your Jira has 25,000 active users across the globe using 100 projects with over a million issues.

    Another administrator has made a change to a field configuration scheme and you now need to re-index Jira.

    What would be the impact of rebuilding the index in the foreground?

    A. Issues will take longer to display during the re-index.
    B. Database backups cannot be run until the re-indexing is complete.
    C. The configuration change will not be applied until re-indexing is complete.
    D. Searches using the field may show erroneous results.
    E. All users will be locked out of Jira until re-indexing completes.

  • Question 3:

    Managers want to ensure that every issue in Jira always has an assignee. Which change will definitely meet this requirement?

    A. Update post functions to set the assignee appropriately at each workflow transition.
    B. Set Default Assignee to Project Lead in every project.
    C. Use components for automatic assignment in every project.
    D. Make the assignee required on workflow transition screens.
    E. Make the assignee required through field configurations.
    F. Set the global option "Allow unassigned issues" to OFF.

  • Question 4:

    An issue is showing the Time Tracking section as follows:

    There is clearly an hour's difference between the Original and Remaining estimates. Identify two possible reasons Logged Time is showing as Not Specified. (Choose two.)

    A. Time tracking was not enabled when the work was logged.
    B. The remaining estimate was adjusted without logging any effort.
    C. The hour's work was logged via a REST call by the user.
    D. The work log would have exceeded the project's time allowance, so it cannot be counted.
    E. The original estimate was increased.
    F. You do not have view permission to see the logged work.

  • Question 5:

    You have a project with several issue types, associated unique workflows, and a number of components.

    The decision has been made to have all new issues assigned automatically.

    To that end, you've set default assignee(s) for the project lead, component leads, and removed the Assignee field from the screens associated with the Create Issue operation.

    One of the issue types is still being created without an Assignee.

    What is the most likely cause of the problem?

    A. The issue type's field configuration for Component/s is not set to Required.
    B. The default assignee for the issues' component is still set to Unassigned.
    C. The post function Assign to Lead Developer is missing in the create transition.
    D. Users creating this issue type do not have the Assign Issue permission.
    E. The assignee is being set to Unassigned in the first post-function of the create transition.

  • Question 6:

    A team complains that many of their issues are in the Closed status, but do not have a resolution set, which causes problems with reporting. The project uses a single workflow.

    You want to set the resolution to Done on all existing issues in the Closed status.

    Which combination of workflow elements and a bulk operation will achieve this?

    A. A temporary transition and a trigger An Edit Issues bulk operation
    B. A temporary transition and a post function A Transition Issues bulk operation
    C. A screen and the Resolution field A Move Issues bulk operation
    D. A screen and a custom field An Edit Issues bulk operation
    E. A temporary transition and a screen An Edit Issues bulk operation

  • Question 7:

    One of your teams has noticed a spelling mistake in the name of an issue type. What should you do before correcting the name of the issue type?

    A. Warn users that dashboard gadgets that refer to the issue type in their configuration will need to be updated with the corrected name.
    B. Warn users that saved filters using the issue type will not be able to find the issue type after the change.
    C. Update the issue type schemes to refer to the new name.
    D. Update the workflow schemes for the issue type to use the new name.

  • Question 8:

    A medical clinic has decided to use Jira. Their project will allow patients to file medical complaints.

    The requirements for the project are as follows:

    Members of the group (jira-patients) must be able to see only their own complaints.

    Members of the group (medical-board) must be able to see all complaints.

    Based only on these two requirements, which two configurations used together will satisfy them? (Choose two.)

    A. Implement an issue security scheme with three levels: (#1) Group (jira-patients), (#2) Reporter, and (#3) Group (medical-board).
    B. Implement an issue security scheme with two levels: (#1) Reporter and (#2) Group (medical-board).
    C. In the permission scheme, add Reporter and Group (anonymous) to Browse Projects and Create Issues.
    D. In the permission scheme, add Group (jira-patients) and Group (medical-board) to Browse Projects and Create Issues permissions.
    E. Implement an issue security scheme with one level: Reporter and Group (medical-board).

  • Question 9:

    Your business owners have told you to use roles as much as possible in Jira because it allows them to do things that groups cannot do.

    When considering this, you need to be aware of those actions in Jira that require the use of groups rather than roles.

    Identify two actions in Jira that require the use of groups. (Choose two.)

    A. allowing users to use transitions in all the workflows
    B. granting Project Administration rights
    C. granting permissions to teams coming from Active Directory
    D. defining Issue Security levels
    E. granting system administrative rights
    F. controlling who can perform Bulk Change in a project

  • Question 10:

    Inspect your current Incoming Mail Handler configuration: Identify one reason why the current configuration is not fetching emails as planned.

    A. The blank space in the Incoming Mail Handler name will cause internal errors.
    B. The syntax of the specified Folder Name is invalid and should be corrected to `/spam'.
    C. A delay of 10000 minutes is not a valid setting and will cause an error.
    D. The external mail service is not able to write the messages to the specified folder.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Atlassian exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your ACP-100 exam preparations and Atlassian certification application, do not hesitate to visit our Vcedump.com to find your solutions here.