  • Question 11:

    Before starting the vCenter Server Appliance from 6.0 to 6.5, which Cluster feature needs to be disabled?

    A. vSphere HA

    B. vSphere DRS

    C. vSphere vMotion

    D. vSphere HA heartbeat datastore

  • Question 12:

    As an engineer working with the ACP 4200, you see that the backup plan in place for the virtual machines relies heavily on VMware snapshots.

    Which statement describes Avaya's position on using VMware snapshots for a backup solution?

    A. VMware snapshots are the most robust backup solution for the ACP 4200.

    B. VMware snapshots should never be used as a backup and recovery method.

    C. VMware snapshots should be stored off site to ensure business continuity.

    D. VMware snapshots should be stored on the ACP 4200 they are backing up.

  • Question 13:

    Which statement about the LifeCycle Manage Workbook (LCM) and any time there is a change made to the ACP 4200 implementation is true?

    A. The LCM only needs to be updated when hardware devices are changed.

    B. Retrieve the LCM from ACP 4200 support prior to making any changes.

    C. The LCM is only needed when receiving the ACP 4200.

    D. Update the LCM with all changes and submit it via email to [email protected].

  • Question 14:

    Which two upgrade tasks are required before upgrading the ESXi servers to 6.5? (Choose two.)

    A. Upgrade the HP Server iLO firmware.

    B. Upgrade the PDU firmware.

    C. Upgrade the switch firmware.

    D. Upgrade the HP Server firmware.

  • Question 15:

    Which two statements are considered backup strategy best practices? (Choose two.)

    A. Create backups of the ACP 4200 system on the storage system inside the pod.

    B. Do not backup to the ACP 4200 itself, backup to an external location.

    C. No backups need to be made as the systems in ACP 4200, and the Pod are already reliable.

    D. VMware snapshots are recommended for virtual appliance backups.

    E. Determine business continuity, compliance, and regulatory considerations.

  • Question 16:

    A support engineer is tasked with upgrading a CPOD 2.1 system to ACP 4200 4.0. Which statement about the upgrade process is true?

    A. Upgrading a CPOD 2.1 system to ACP 4200 4.0 is supported, and a direct upgrade path is supported.

    B. Upgrading a CPOD 2.1 system to ACP 4200 4.0 is supported only if the Rack enclosure is replaced with a new 48 Inch Deep Model.

    C. Upgrading a CPOD 2.1 system to ACP 4200 4.0 is not supported.

    D. Upgrading a CPOD 2.1 system to ACP 4200 4.0 is supported, but a direct upgrade path is only partially supported.

  • Question 17:

    What would a support engineer expect to find when using MSC to support, troubleshoot and maintain the ACP 4200 4.0?

    A. All current and previous license files

    B. Software library store

    C. Pod Upgrade Manager (PUM)

    D. VMware vSphere client application for VMware 6.5

  • Question 18:

    What is the first step in upgrading the VSP switches in an Avaya ACP 4200?

    A. Verify redundancy is active.

    B. Power down secondary device.

    C. Verify connectivity to NTP server.

    D. Disable Telnet access.

  • Question 19:

    Service warning alarms are being received by Orchestrator indicating that Port 27 on VSP 4850-1 is down.

    How would a support engineer determine the equipment that is connected to this port?

    A. Network Diagram in the Lifecycle Workbook

    B. Switch Wiring tab in the Lifecycle Workbook

    C. ACP Installation Guide

    D. Physical inspection

  • Question 20:

    Which key consideration is critical when upgrading an application in your ACP 4200 system?

    A. Ensuring that the application server is able to contact http://support.avaya.com

    B. Validating the customer lifecycle workbook information and updating any undocumented changes that were made

    C. Ensuring that you have the latest VSP software installed

    D. Checking the IP Template for the application information and updating it with any changes made to the application

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Avaya exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 76940X exam preparations and Avaya certification application, do not hesitate to visit our Vcedump.com to find your solutions here.