ISTQB-CTFL Exam Details

  • Exam Code
    :ISTQB-CTFL
  • Exam Name
    :ISTQB Certified Tester Foundation Level (CTFL v4.0)
  • Certification
    :ISTQB Certifications
  • Vendor
    :ISTQB
  • Total Questions
    :419 Q&As
  • Last Updated
    :May 24, 2026

ISTQB ISTQB-CTFL Online Questions & Answers

  • Question 211:

    Which of the following work products cannot be examined by static analysis?

    A. Test plans
    B. Source code
    C. Compiled code
    D. Formal models

  • Question 212:

    Which of the following BEST describes a benefit of test automation?

    A. More subjective assessment
    B. Reduction in repetitive manual work
    C. Availability of the test automation tool vendor
    D. Negligible effort to maintain the test assets generated by the tool

  • Question 213:

    Which statement best describes the key difference between a mindset for test activities and a mindset for development activities?

    A. A tester possesses professional pessimism while a developer is concerned with validating the product
    B. A tester is concerned with finding defects while a developer is interested in designing solutions
    C. A tester is interested in building solutions while a developer is concerned with verifying the product
    D. A tester is concerned with verifying the product while a developer possesses professional pessimism

  • Question 214:

    In which one of the following test techniques are test cases derived from the analysis of the software architecture?

    A. Black-box test techniques.
    B. Experience-based test techniques.
    C. Checklist-based test techniques.
    D. White-box test techniques.

  • Question 215:

    Which of the following statements about test activities that form the overall test process is correct?

    A. Test planning determines what is to be tested based on the test basis.
    B. Test analysis evaluates the test base and the test elements to identify inconsistencies.
    C. Test design develops and prioritizes test procedures and may create automated test scripts.
    D. Test implementation realization answers the question of how to perform the test, and the test procedure compares the results of the test with the expected results.

  • Question 216:

    Which of the following coverage criteria results in the highest coverage for state transition based test cases?

    A. Can't be determined
    B. Covering all transitions at least once
    C. Covering only start and end states
    D. Covering all states at least once

  • Question 217:

    Which of the following provides the BEST description of statement coverage?

    A. A white-box test technique which covers the decision results which determine the next statement to be executed
    B. A black-box test technique which uses a state table to derive test cases
    C. A white-box test technique which focuses on the percentage of executable statements that has been executed by a test suite
    D. An experience-based test technique in which test cases are based on the tester's knowledge of past failures

  • Question 218:

    Use Scenario 1 "Happy Tomatoes" (from the previous question).

    When running test case TC_59, the actual result for t = 35 degrees Celsius is OUTPUT = X instead of the expected output.

    Which information should NOT be included in the defect report?

    A. Identification of the test object and test environment
    B. A concise title and a short summary of the defect being reported
    C. Description of the structure of the test team
    D. Expected results and actual results

  • Question 219:

    Match each objective to the correct test level

    Objective:

    A. Verifying whetherthe functionalandnon-functlonalbehaviorsof the system are as designed andspecified.
    B. Verifying whetherthe functionalandnon-functlonalbehaviorsof the interfaces are as designed.
    C. Verifying whetherthe functionalandnon-functionalbehaviorsof the components are as designedand specified.
    D. Establishing confidence in the quality of the systemas a whole. Test Level: 1.Component testing. 2.Integration testing. 3.System testing. 4.Acceptance testing.
    E. A3, B2. C4. D1
    F. A2, B3, Cl, D4
    G. A3. B2. C1. D4

  • Question 220:

    Which of the following activities is NOT a pan of the fundamental testing process?

    A. Archiving automation code
    B. Test status reporting
    C. Test process improvement
    D. Build release and maintenance

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only ISTQB exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your ISTQB-CTFL exam preparations and ISTQB certification application, do not hesitate to visit our Vcedump.com to find your solutions here.