HPE6-A80 Exam Details

  • Exam Code
    :HPE6-A80
  • Exam Name
    :Aruba Certified Design Expert Written
  • Certification
    :HP Certifications
  • Vendor
    :HP
  • Total Questions
    :60 Q&As
  • Last Updated
    :Jul 12, 2026

HP HPE6-A80 Online Questions & Answers

  • Question 51:

    Refer to the exhibit.

    Exhibit: A49.01114316-102

    The architect has determined that this building requires two 10GPE links to the data center.

    What is the correct transceiver type for the links?

    A. 3FP+ LRM with mode conditioning
    B. SFP+ SR
    C. SFP+ LRM
    D. SFP+ LR

  • Question 52:

    A customer has an Aruba solution with APs, MCs, and an MM The customer also uses AirWave and ClearPass. The customer wants to add Aruba CX Switches, which use per- user tunneled node, to the solution. How should the Aruba CX Switches integrate with the existing solution in order to determine when to tunnel device traffic to MCs?

    A. They should be managed by AirWave with SNMPv3.
    B. They should implement authentication to ClearPass.
    C. They should be directed to MCs by a DHCP or DNS server.
    D. They should be manually added as MDs in MM.

  • Question 53:

    DRAG DROP

    Match each hospital room with a potential issue for the AP design (Each match will be used once.)

    Select and Place:

  • Question 54:

    A customer needs an AP for an indoor lecture nail mat is about 82 feet (25 m) by 32 feet (25 m) and has 300 seats. The ceiling height is 15 feet The expected take rate is 100 percent.

    The network needs to support the student laptops, which all support S02.Hac and some support 802.11ax standard.

    The customer would like to obtain as many usable cells as possible with as few APs as possible.

    Which of these APs meets the requirements?

    A. AP-335
    B. AP-S15
    C. AP-345
    D. AP-535

  • Question 55:

    An archinect needs lo plan a Mobility Master (MM) solution for a customer Requirements include:

    *

    redundancy for the MM

    *

    redundancy for the MCS (seamless failover if up to one fails)

    The wireless network consists of

    *

    total APs - 300

    *

    total wireless devices = 20,000

    *

    total MCs = 10

    The customer wants the most cost-effective plan that meets me requirements.

    Which plan for MMs should the architect select?

    A. 1 MM-HW-5K and 1 MM-VA-1K
    B. 2 MM-HW-5K
    C. 1 MM-HW-5K and 1 MM-HW-1K
    D. 2 MM-HW-1QK

  • Question 56:

    Refer to exhibit.

    A customer has a building that needs a switch upgrade. The customer would like at least 20Gbps for the uplink bandwidth out of each closet. The building wiring plan is shown in Exhibit i. The customer will not consider any cabling upgrades at this point. The current proposal is shown in Exhibit 2.

    Which correction must the architect make to the proposal to meet the customer requirements?

    A. Add an aggregation layer, and connect wiring closet switches to the aggregation layer on Smart Rate pons.
    B. Add a mode conditioning cable for each link between the wiring closet switches and the network core.
    C. Change the SR transceivers tor each link between the wiring closet switches and me network core to LRM transceivers
    D. Add an aggregation layer, and connect wiring closet switches to the aggregation layer with SFP+- SR transceivers

  • Question 57:

    A retail customer is doing a wired and a wireless refresh with Arut>a CX switches and S02.11ax APs. Currently, trey nave wireless Point of Sales (PoS) systems and would like to assure that the proposed deployment solution will comply with the Payment Card Industry (PCI) Data Security Standard (DSS) requirements. The architect have proposed the following deployment solutions regarding PCI DSS requirements' -IDS/IPS -Aruba APs in hybrid mode as well as in dedicated AMs mode -Strong authentication and encryption for wireless -Built-in firewall and role-based access controls to segment WLAN Which other requirements must you include in the existing deployment solution? (Select two.)

    A. Select the FIPS/TAA-compliant version for the Access Points.
    B. Suggest MACSet between the Aruba CX switches that encrypt all traffic over the link.
    C. Switch high-availability solution VSF and VSX also can encrypt all traffic on their switch links.
    D. Aruba Central or Aruba AirWave to generate a scheduled compliance reporting.
    E. Role-based access controls for wired users using ClearPass. Optionally ; tunneled-node to MCs.

  • Question 58:

    Refer to the exhibit.

    The exhibit shows the current AP deployment In a warehouse that stores frozen food goods:

    *

    APs are mounted on the ceiling, which is 15 feet (4.6 m) high.

    *

    Shelves are 12 feet (3.7 m) high and are typically fully stocked.

    This customer indicates that their current wireless performance is inadequate.

    What should the network architect include in the new solution to resolve this issue?

    A. APS deployed on the ceiling in the same current locations, out with dual 5GHz radios
    B. APs deployed on the ceiling in each aisle, due to the high absorption between aisles
    C. APs deployed with directional antennas on the ceiling, due to the high 15-foot callings
    D. APs deployed with directional antennas and a hybrid wall-mount, ceiling-mount design

  • Question 59:

    Refer to the exhibit.

    A customer has these availability requirements;

    loss of one controller with stateful failover and without impact on wireless client connectivity loss of one core switch without loss of connectivity for any endpoints or APs in the building loss of any one switch-lo-switch or MC-to-switch link without loss of connectivity for any endpoints or APS in the building and with minimal impact on infrastructure functionality loss of any one access switch with minimal impact to wireless client connectivity

    The exhibit shows the current plan for the topology.

    Which change should the architect make to the plan to provide better support for the customers availability requirements?

    A. Add VLANs 11 and 15 to the MC connections to ensure both MCS can manage any of the APS.
    B. Add 120 additional AP licenses, so that each MC can support ail the APs, even if the other MC fails.
    C. Use two 40GBE DACs between the core V3X switches for their switch links.
    D. Change the 40GbE DAC on the 8400 switch to a stacking cable with stacking module.

  • Question 60:

    A retailer wants to add a wireless network to its stores to provide guest access. The store has wired POS systems which the customer will now replace with wireless systems. What is one Important security action that the wireless solution supports to comply with PCI DSS?

    A. Use test-practice, factory default settings for security settings and login credentials.
    B. Implement TKIP encryption on the wireless network used by POS devices.
    C. Impose mandatory clean up periods to delete records of user access to controllers
    D. Enforce role-based access control on administrators who access controllers

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only HP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your HPE6-A80 exam preparations and HP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.