HPE6-A80 Exam Details

  • Exam Code
    :HPE6-A80
  • Exam Name
    :Aruba Certified Design Expert Written
  • Certification
    :HP Certifications
  • Vendor
    :HP
  • Total Questions
    :60 Q&As
  • Last Updated
    :Jul 12, 2026

HP HPE6-A80 Online Questions & Answers

  • Question 21:

    In which scenario do Aruba CX 6400 Series switches, but not Aruba 6300M Series switches, meet the needs Tor a wired upgrade?

    A. The customer requires switches in the same closet to operate together as a single switch for Link Aggregation but to be managed as separate devices.
    B. The customer requires enhanced redundancy at the access layer and wants to ensure that each switch can continue to operate even if a power supply fails
    C. The customer requires each access layer switch to support at least 25Gbps on its fiber uplinks at all times; including if up to one uplink tails.
    D. The customer has recently deployed Aruba AP-535 APs and is concerned about a future-proof wired edge that will continue to support expanding bandwidth requirements.

  • Question 22:

    Refer to the exhibit.

    A customer needs to create a proposal for a full wireless solution for a customer The customer has indicated that the MCs will connect to Aruanda CX Switches at the core and the APs will connect to PoE-i- switches at the edge. The customer requires that the wireless solution support at least 50 Mbps concurrently per AP. The architect has created a BOM tor a Mobility Master (MM), two MC 721os, and 400 AP-535S. me exhibit snows this BOM.

    Which components has the architect forgotten?

    A. SFP+ transceivers tor the MC connections
    B. Smart Rate PoE+ injectors for the APs
    C. Mounting Kits tor the MOs and MM
    D. Sufficient Enterprise licenses for the APs on both MCs

  • Question 23:

    Refer to the exhibit.

    A customer needs a wireless network upgrade and has these requirements.

    -

    Support any applications used on a wired connection

    -

    Support up to 2500 wireless clients

    - Support seamless roaming from floor to floor and building to building

    -

    Continue to function seamlessly if one controller fails The architect has designed the logical infrastructure for the network as shown in the exhibit Which change should the architect make to belter meet customer requirements and besl practices?

    A. Combine me /25 subnets for wireless and wired users into a /16 subnet.
    B. Install additional Mobility Controller.
    C. Combine the /25 subnets for wireless users into a /20 subnet
    D. Place each controller in a different VLAN and subnet.

  • Question 24:

    A customer has multiple, very small branch sites that require just one or two APs each. The office has a local Internet connection, but all of the traffic is destined To the corporate data center, which has an Aruba wireless solution. Which branch office solution best meets the customer needs?

    A. RAPs and no branch office controllers
    B. IAPs and 7005 branch office controllers with an 3D-WAN license
    C. CAPS and 7005 branch office controllers
    D. RAPs and 7005 branch office controllers with an. SD-WAN license

  • Question 25:

    Refer to the exhibit.

    A customer has the wined infrastructure shown in the exhibit. The customer is in the process of expanding their wireless services They will now add a new wireless solution, with mobility controllers (MCs) connected as shown. The new

    wireless solution will support a total of 450 APs and about 26,000 wireless devices. It must provide seamless roaming across the entire campus.

    After the new deployment, both wired and wireless devices experience IP connectivity issues.

    Which change to the existinginfrastructureshould the architect recommend to support all of the customer requirements?

    A. The wired VLANS should be combined into a single VLAN and n6 subnet
    B. The core switches should be replaced with switches that have larger ARP tables.
    C. The MCs should be moved to the aggregation layer, and more MCs added
    D. The core and aggregation switches should disable Virtual Switching Framework (VSF).

  • Question 26:

    Refer to the exhibit.

    A customer requires a core switching solution for a very large multi-building campus with about 30;ooo wireless clients and devices. The network will have a flat topology as shown in the exhibit, and MCs will forward all wireless traffic to the

    core for routing.

    The customer had considered Aruba 5400R Series switches, but the architect recommends Aruba S320 switches Instead.

    How should the architect justify this recommendation?

    A. The 8320 switches are required to eliminate the aggregation layer as the customer desires.
    B. The 3320 switches offer more extensive mobility integration features with Aruba MCs and APs than the 54C0R Series switches do.
    C. The 3320 switches support a higher density of 10GbE fiber ports than the 5400R Series.
    D. The 8320 switches have greater performance and larger ARP tables than the 54Q0R Series, as is necessary for a network this size.

  • Question 27:

    Which scenario Indicates the need for a wireless mesh?

    A. A nsstorical building has some wired areas and a few areas with no wired or wireless connectivity, walls and ceilings have asbestos. The company needs wireless access across the site.
    B. A hospital needs to provide high availability for wireless services in certain areas which support very critical wireless medical devices. Devices must always be in range of at least two APs.
    C. A company has a small branch office with just one RAP. The company has noticed that performance is poor in some areas of the network and wants to add another AP.
    D. A company needs to provide seamless roaming and wireless access between two buildings. The buildings are about 60 feet (18 m)apart.

  • Question 28:

    Refer to the exhibit.

    The network architect has created the 60M shown in the exhibit tor a complete new wired ana wireless solution for a customer. This solution the customer wants to discover and manage every component or the network in Airwave, including twins, MCS, APS, and switches.

    How many AirWave licenses dees the architect need to add?

    A. 30
    B. 222
    C. 7122
    D. 6930

  • Question 29:

    The architect plans to recommend an upgrade to Aruba CX switches

    What is one requirement for the new solution that justifies this recommendation?

    A. the requirement to support secure IPsec tunneling at the aggregation layer
    B. the requirement to support larger ARP tables at the aggregation layer
    C. the requirement to support smart Rate at the access layer
    D. the requirement to support tunneled-node at the access layer

  • Question 30:

    A nospltai needs an upgrade to 802.11ax for its wireless network, which needs to provide complete coverage The hospital has a concrete exterior and uses drywalls lor all of the interior walls with a few exceptions as mandated for safety The building has 10fool (3 m) ceilings. The hospital prefers to avoid the deployment of APs in rooms if possible. Exceptions include reception areas and lounges. The wireless network must support wireless medical devices, voice communicators for medical star, laptops in nursestations, medical staff tablets, and visitor and patient personal devices. All of these devices support both the 2.4GHz

    and5GHz band.

    The exhibits below show one wing of one floor of the hospital. This wing is about 2S.Q0D square feet {2GQQ sq, m). The unlabeled rooms along the bottom of the wing are patient rooms' other rooms such as lounges and the MR] room are

    labeled. This area has:

    *

    up to SO concurrent patients and visitors, who might have up to two devices

    *

    about 200 medical and other types of wireless devices

    The architect has already planned to place APs in stairwells on another floor.

    Which AP plan for this wing of this floor meets the customer needs?

    A. Option A
    B. Option B
    C. Option C
    D. Option D * 40 concurrent staff members, who might have up to three devices

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only HP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your HPE6-A80 exam preparations and HP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.