  • Question 91:

    You modified a logical interconnect group mat is used to configure logical interconnects in five different logical enclosures. What will be the impact of that change?

    A. All physical interconnects from affected logical interconnects will be placed in a maintenance mode
    B. All physical interconnects from the affected logical interconnects must he rebooted to activate the new configuration
    C. All logical interconnects configured using this logical Interconnect group will report inconsistency
    D. All logical interconnects configured using this logical interconnect group will be automatically updated

  • Question 92:

    Which statement about HPE OneView milestone releases is true?

    A. A milestone release is a release which must be installed on HPE Composer to support current version of the Service Pack for Synergy
    B. A milestone release is a release that is published when HPE releases new hardware components to immediately support new systems
    C. A milestone release is available for selected partners that give access to HPE OneView features which are not officially announced.
    D. A milestone release is a release with an enhanced update architecture mat is a prerequisite prior to updating to a subsequent release.

  • Question 93:

    DRAG DROP

    After HPE Superdome Flex deployment and nPar setup, you need to verify health status of HPE Superdome Flex components.

    Put the steps on the left into the coned order on the right to perform this task.

    Select and Place:

  • Question 94:

    Refer to the exhibit.

    Which statement about this logical interconnect group is true?

    A. Both modules are located in different frames for redundancy
    B. For an uplink set, ports from different modules can be selected
    C. interconnect modules are installed in interconnect bays 1 and 4
    D. An additional license is required to change the enclosure count

  • Question 95:

    Your customer is trying to grow a VMware duster using HPE OneView for VMware vCenter Server. They get an error and cannot proceed Which tool should you use to troubleshoot the problem?

    A. HPE One View for VMware vCenter Server to verify if server profile template s property imported and registered
    B. vCenter Server to verify if an OS Bund Plans property defined and has ESXi image uploaded
    C. HPE OneView interface to import an existing cluster using the hypervisor cluster profile functionality.
    D. ILO interlace of a given HPE Synergy compute node to verify whether this node is registered within HPE Oneview.

  • Question 96:

    Refer to Exhibit:

    Your customer plans to update the firmware for the logical interconnect shown.

    Based on the information in the exhibit, which statement about network connectivity is true?

    A. Only the manual orchestration method will allow a firmware upgrade without causing network downtime.
    B. It is possible to update this logical interconnect without network downtime if orchestrated method is used.
    C. Compute nodes will experience network downtime if the Force option is selected, as it will enforce parallel update.
    D. Compute nodes will experience network downtime not longer than 1 minute regardless of the orchestration method.

  • Question 97:

    HOTSPOT

    Click the option that will allow you to change the ESXI image used In an OS Deployment Plan.

  • Question 98:

    HOTSPOT

    Your customer is implementing an HPE Synergy solution based on three frames.

    Click each of the ports that can be used to connect satellite modules.

  • Question 99:

    Which statement about HPE Apollo 2000 Gen10 Plus platform is true?

    A. It is equipped with HPE Persistent memory by default
    B. It can support a single processor only and up to 4 per chassis
    C. It is fully managed using HPE OneView including all connections
    D. It offers servers with AMD EPYC and Intel Xeon Scalable CPUs

  • Question 100:

    Refer to the exhibit.

    Which statement about this logical interconnect group is true?

    A. The master modules are located in the interconnect bays 2 and 5
    B. For the given downlink speed, the maximum number of frames is reached
    C. Both master modules are located in the same HPE Synergy frame
    D. To use interconnect bay set 3, all compute nodes must be half-height

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only HP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your HPE0-S59 exam preparations and HP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.