HP2-K34 Exam Details

  • Exam Code
    :HP2-K34
  • Exam Name
    :Supporting and Servicing HP 3PAR StoreServ Solutions
  • Certification
    :HP Certifications
  • Vendor
    :HP
  • Total Questions
    :55 Q&As
  • Last Updated
    :Dec 08, 2021

HP HP2-K34 Online Questions & Answers

  • Question 21:

    A customer has an HP 3PAR StoreServ 7200 with SSD and SAS drives only. The customer wants to add a shelf with NL drives to implement a tiering solution for infrequently used data. According to HP best practices, which configuration will help the customer achieve the best protection in this environment?

    A. drives in RAID 6
    B. drives in RAID 5
    C. 12 drives in RAID 5
    D. 12 drives in RAID 6

  • Question 22:

    Where do you start the HP 3PAR InServ code update?

    A. HP 3PAR SmartStart disk
    B. SPMAINT on SPOCC
    C. HP 3PAR InServ CLI
    D. System tab in HP 3PAR Management Console

  • Question 23:

    You are troubleshooting a SmartStart installation of an HP 3PAR StoreServ system. Which log is covered in the ARSETLOG.system_serial_number log file?

    A. the console mapping log
    B. the SmartStart process log
    C. the storage system setup log
    D. the Service Processor setup log

  • Question 24:

    Which statement is true regarding controller node ports on an HP 3PAR system?

    A. iSCSI ports are always set to target mode,
    B. Initiator ports receive all the commands from hosts.
    C. Remote Copy over IP (RCIP) port is set to peer mode.
    D. A target port sends all the commands to the disks.

  • Question 25:

    What is an advantage of Cache persistence?

    A. It eliminates the performance penalties associated with traditional arrays and Write-through mode by maintaining required service levels even in the event of a controller-node failure or upgrade
    B. It increases performance and resilience because itis automatically enabled during bus; workloads
    C. It ensures that when a controller node is placed into Cache Write-through mode, the node will dynamically form a mirrored cache relationship with another storage controller node
    D. In the event of a partner-node failure, it allows a node to mirror the write data to all nodes that do not have direct access to the drives

  • Question 26:

    Which statement is correct about using the Guided Maintenance (GM) scripts on an HP 3PAR StoreServ system?

    A. The GM scripts have to be run on a 3PARsvc to replace the drive chassis midplane.
    B. The Service Processor and node clock battery cannot be removed and replaced by using the GM scripts.
    C. The GM scripts have to be run on a 3PARsvc to replace the Service Processor.
    D. The Controller Node and drive cage cannot be removed and replaced by using the GM scripts.

  • Question 27:

    What is significant about controller slots 1, 4, 2, and 3 on an HP 3PAR 10400?

    A. The slots are RCIP, Management, and Console serial slots.
    B. The slots are not accessible and are reserved for future use.
    C. The slots are recommended for Remote Copy FC.
    D. The slots are for disk chassis FC.

  • Question 28:

    A customer wants you to configure a 25 TB upgrade to an existing array. First, you need to retrieve the customer's current 3PAR configuration. Which piece of information is necessary to achieve this goal?

    A. InServ serial number
    B. HP order number
    C. customer Service Agreement ID (SAID)
    D. Service Processor IP address

  • Question 29:

    A support service provides automated monitoring while performing proactive utilization checks on key 3PAR system elements using data that resides at HP. In addition, it provides customers with valuable information to assist in keeping storage systems running optimally. Which HP support service provides this functionality?

    A. Automated Over-Subscribed System Alerts
    B. Proactive Support
    C. System Reporter
    D. System Support Services Manager

  • Question 30:

    What must you consider when preparing an HP 3PAR StoreServ system for a first-time installation?

    A. The HP 3PAR SmartStart DVD has to be used to set up the storage system for the first time.
    B. The 60-days-lnstant-On licenses have to be generated before the storage system is set up.
    C. The Virtual Service Processor has to be in place to set up the HP 3PAR StoreServ storage system
    D. The system has two serial numbers, and the 3PAR serial number is used during system setup

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only HP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your HP2-K34 exam preparations and HP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.