HP0-S33 Exam Details

  • Exam Code
    :HP0-S33
  • Exam Name
    :Advanced Integration and Management of HP Server Solutions
  • Certification
    :HP Certifications
  • Vendor
    :HP
  • Total Questions
    :78 Q&As
  • Last Updated
    :Jul 12, 2026

HP HP0-S33 Online Questions & Answers

  • Question 1:

    You are working with a customer who is planning to run critical applications on VMware virtual machines. A secondary data center is planned that will be used as a backup center in case of a disaster. Which product should you include in your proposal to satisfy the disaster recovery requirement for this solution?

    A. Site Recovery Manager
    B. Insight Control server migration
    C. vCenter Server Virtual Appliance
    D. Logical Server Migration

  • Question 2:

    Which HP software delivers active health and performance monitoring?

    A. Insight Dynamics
    B. Insight Remote Support
    C. Insight Control
    D. Insight Rapid Deployment

  • Question 3:

    You are installing a second BladeSystem Onboard Administrator into a c7000 enclosure, what is required for a successful active/standby relationship?

    A. You must reboot the active OA.
    B. The same firmware version must be installed
    C. You must issue a failover to the newly installed OA
    D. The IP address for each OA must be sequential

  • Question 4:

    A consultant is installing HP Power Protector on a VMware ESXi 4.1 server. What is needed for HP Power Protector to work correctly? (Select three)

    A. Install HP Power Protector for Linux as an agent on the VMware ESXi 4.1 host.
    B. Install HP Power Protector for VMware as a manager on the VMware ESXi 4.1 host.
    C. Configure the firewall to block the ports used by HP Power Protector.
    D. Install HP Power Protector for Linux as an agent on the VMware ESXi 4.1 VIMA/vMA.
    E. The vSphere Client must be installed on a different machine for VMware ESXi 4.1 Server configuration
    F. Configure the firewall to allow the ports used by the HP Power Protector.

  • Question 5:

    A consultant must provide a UPS solution to support the load requirement of a server solution being delivered. What is the recommended tool to use to provide the correct UPS solution?

    A. HP Rack and Power Sizer (upssizer.com)
    B. HP Value UPS Manager
    C. HP Rack and Power manager
    D. HP Power Advisor

  • Question 6:

    A customer needs a direct attached based storage for a BladeSystem and wants a solution that enables low cost zoned or shared storage. Which type of HP external storage meets the customer requirements?

    A. Direct Connect SAS storage
    B. Infiniband
    C. Fibre Channel over Ethernet
    D. Serial Attached SCSi

  • Question 7:

    A customer is running a Matrix Operating Environment to manage a virtualized environment with ESX and Hyper-V hosts. The customer wants to prepare an initial performance baseline for the environment. Which tool can be used to prepare this baseline?

    A. Insight Control performance management
    B. Performance Quick Reference tool
    C. Active Health System log
    D. Insight Performance Orchestrator

  • Question 8:

    You want to add a new network to the existing VC domain managed through VCEM. When you try to access VCM, you get a message that the VC domain configuration is not available from the VCM module and should be performed from the

    VCEM level. You cannot locate an option in VCEM to add/modify vNet settings.

    What should you do?

    A. Put the domain into the maintenance mode using the VCEM and modify the configuration using VCM.
    B. Log into HP SIM using the account with the CMS full configuration rights and modify the VC settings using VCEM.
    C. Use the RBCL scripts and VC CLI to add/modify vNet.
    D. Use the Virtual Connect Support Utility to modify domain settings.

  • Question 9:

    A customer has an HP 10642 G2 Rack with Multiple DL2000 servers. The power connection to the rack is by two full length 7.36 kVA 32A single phase international PDUs with SNMP management module installed. As shown in the exhibit, the DL 170e servers in the DL2000 chassis are being blocked in by the PDU.

    What can be done to allow the DL 170e to be removed for servicing?

    A. Replace the Existing PDUs with full length, 11kVA 16A 3Phase PDUs.
    B. Replace the existing PDUs with a modular PDU solution.
    C. Replace the existing PDUs with an iPDU Solution.
    D. Mount the existing PDUs upside and feed the power from the top of the rack.

  • Question 10:

    A customer is running HP SIM in a headquarters that has three branch offices with multiple server blades managed by the HP SIM in a central location. Version Control Repository Manager is configured in all branch offices, but all deployment tasks should be performed from the central location. What must you configure first?

    A. all remote VCRMs properly licensed
    B. Secure tunnel between headquarters and the branch offices
    C. Additional CMS server in the brach offices that will not perform any management function and will work as a federated CMS and give access to the local VCRM
    D. Trust relationship between HP SIM and the machines running VCRM in remote locations

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only HP exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your HP0-S33 exam preparations and HP certification application, do not hesitate to visit our Vcedump.com to find your solutions here.