DES-4122 Exam Details

  • Exam Code
    :DES-4122
  • Exam Name
    :Specialist - Implementation Engineer PowerEdge Version 2.0
  • Certification
    :EMC Certifications
  • Vendor
    :EMC
  • Total Questions
    :60 Q&As
  • Last Updated
    :Jul 14, 2026

EMC DES-4122 Online Questions & Answers

  • Question 1:

    Where is the data stored to allow Easy Restore to successfully complete a system board replacement?

    A. NAND Flash module on the disk drive mid plane
    B. IDSDM SD card
    C. vFlash SD card
    D. Serial Flash storage in the server's front panel

  • Question 2:

    CORRECT TEXT

    For security reasons, the Dell EMC PowerEdge server power button must be disabled. Use the System Setup Utility in the simulator to disable the power button. When you have finished using the simulator, click Next.

    A. No answer
    B. Place Holder
    C. Place Holder
    D. Place Holder

  • Question 3:

    A technician is sent on-site to troubleshoot a server that produced an error message during the most recent POST, but then completed the POST and booted to the operating system. The user cannot remember the specific error and no entry was made in the error log relating to this error.

    How can the technician find out what the error message was?

    A. Access the Lifecycle Controller and view the last boot cycle video capture entry
    B. Reload the BIOS firmware
    C. Export the Server profile and analyze for any POST errors
    D. Access the iDRAC and view the last boot cycle video capture entry

  • Question 4:

    What is the drive characteristic of a BOSS M.2 drive in a Dell EMC PowerEdge server?

    A. Single-level cell
    B. Read Intensive
    C. Quad-level cell
    D. Write Intensive

  • Question 5:

    What is a characteristic of SupportAssist Enterprise on Dell EMC PowerEdge 14G servers?

    A. Used for customers that want monitoring of fewer than 1,000 server, storage, and networking devices
    B. Dispatches technical support from Dell for all Dell servers, storage, and networking devices
    C. Proactive, predictive, and automated support technology to enable faster resolution and reporting
    D. Includes onsite monitoring and automated collection of system state information

  • Question 6:

    A Dell EMC PowerEdge R740 server requires a vFlash SD card urgently. Additional vFlash Cards and components from other servers are available. What is the recommended solution?

    A. Use a configuration option to convert an NVMe drive to a virtual vFlash
    B. Use a configuration option to convert BOSS to a virtual vFlash
    C. Reuse an existing vFlash SD card from a 14G server
    D. Reuse an existing vFlash SD card from either a 13G or 14G server

  • Question 7:

    How can a technician know whether IDRAC9 System Lockdown mode is enabled?

    A. Lockdown activation message in red box in the iDRAC web GUI Access to LCC is disabled when the server boots
    B. Lockdown activation message in red box in the iDRAC web GUI Access to LCC requires a password when the server boots
    C. Lockdown activation message in yellow box in the iDRAC web GUI Access to LCC is disabled when the server boots
    D. Lockdown activation message in yellow box in the iDRAC web GUI Access to LCC requires a password when the server boots

  • Question 8:

    What is a characteristic of out-of-band management?

    A. Dedicated device
    B. Agent based
    C. Less secure
    D. Dependent upon OS

  • Question 9:

    Which mobile devices are supported by Quick Sync 2.0 in 14G PowerEdge servers?

    A. Android devices only
    B. iOS, Android, and Windows Phone devices
    C. iOS and Android devices only
    D. iOS devices only

  • Question 10:

    An engineer needs to install an additional PSU on an existing, single PSU Dell EMC PowerEdge R740. They complete the initial installation and cabling procedures. They connect an AC cable and the power distribution unit produces normal AC output. The engineer checks power management and sees that the new PSU is in the Failed state.

    What task should be completed to troubleshoot this issue?

    A. Confirm the System Input Power CAP is not set to Low
    B. Set the PSU AC redundancy to 1+1
    C. Set the PSU AC redundancy to 1+0
    D. Verify the new PSU is the same type and wattage rating

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only EMC exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your DES-4122 exam preparations and EMC certification application, do not hesitate to visit our Vcedump.com to find your solutions here.