Repetitive Manufacturing and continuous manufacturing are types of:
A. Flow Manufacturing
B. Intermittent Manufacturing
C. Project Manufacturing
D. None of these
Manufacturing process can be conveniently organized into following categories EXCEPT:
A. Flow Manufacturing
B. Intermittent Manufacturing
C. Project Manufacturing
D. Work Center Manufacturing
Which one of the following is NOT done by PAC in control phase?
A. Monitor and control work-in-process, lead times, and work center queues.
B. Report work center efficiency, operation times, order quantities and scrap.
C. Track the actual performance of work orders and compare it to planned schedules.
D. Ensure that required materials, tooling, personnel and information are available.
This is a true representation
A. MRP
B. Capacity Control
C. PAC
D. MRP II
Gather the information needed by the shop floor to make the product. Release orders to the shop floor as authorized by the material equipment plan. This is called dispatching. Production activity control will do such things in:
A. Planning phase
B. Implementation phase
C. Control phase
D. Both A and B
The flow of work centers must be planned to meet delivery dates which means production activity control must do the following:
A. Ensure that the required materials, tooling, personnel and information are available to manufacture the components when needed.
B. Schedule start and completion dates for each shop order at each work center so the scheduled completion date of the order can be met. This sill involves a planner in developing a load profile for the work centers.
C. Both of these
D. None of these
The material requirement plan authorizes production activity control (PAC):
A. To work orders to the shop for manufacturing
B. To take control of work orders and make sure they are completed on time
C. To manage day-to-day activity and provide the necessary support
D. All of these
Production activity control is responsible for executing the:
A. Production Schedule
B. MRP
C. Both of these
D. Capacity control
How many standard hours are needed to run an order of 200 pieces if the setup time is 1.3 hours and the run time 0.3 hours per piece? How many actual hours are needed at the work center if the efficiency.130% and the utilization is 70%?
A. 51.3 standard hours; 67.4 actual hours
B. 62 standard hours; 60.4 actual hours
C. 61.3 standard hours; 67.4 actual hours
D. 61.3 standard hours; 60.4 actual hours
Over a period of 4 weeks, a work center produced 50, 45, 40, and standard house of work. What is the demonstrated capacity of the work center?
A. 47.8
B. 47.5
C. 48
D. 49.5
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only APICS exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your CPIM-MPR exam preparations and APICS certification application, do not hesitate to visit our Vcedump.com to find your solutions here.