Exam Details

  • Exam Code
    :7303
  • Exam Name
    :Avaya CallPilot Implementation Exam
  • Certification
    :Avaya-Certification
  • Vendor
    :Avaya
  • Total Questions
    :68 Q&As
  • Last Updated
    :May 16, 2024

Avaya Avaya-Certification 7303 Questions & Answers

  • Question 51:

    An administrator cannot login to Avaya CallPilot Manager from the login web page. A technician has confirmed that the administrator is entering their correct mailbox number and password and that their mailbox is not disabled. What should be checked?

    A. that the user's PC is running Internet Information Server (IIS)

    B. that the Server Held contains the correct server name for the Avaya CallPilot system

    C. that theLocation field contains the correct server name for the Avaya CallPilot system

    D. that the Secure Sockets Layer (SSL) option is turned on because passwords can only be passedover SSL

  • Question 52:

    The Avaya CallPilot server comes pre-loaded with Windows Server 2003 and Avaya CallPilot Manager. A technician has installed a new Avaya CallPilot RIs. 5.0 system and has logged on to the server for the first time to begin server configuration.

    Which wizard rechecks for platform and software validity, and then, if performing an upgrade or platform migration, upgrades and restores the existing data?

    A. Setup Wizard

    B. Upgrade Wizard

    C. Configuration Wizard

    D. WindowsServer2003 Wizard

  • Question 53:

    A technician observes the following error on a 1006r.

    "Adapter 1 Channel 1 Target 6: Status of Power Supply #2=0x80: Unknown status, or Status Not Reportable"

    Which action should be performed?

    A. Reseat and/or replace Power Supply #2.

    B. Contact an electrician to investigate.

    C. Ensure the alarm monitor cable is properly connected.

    D. The error is self-correcting and no actionis required.

  • Question 54:

    A company is running Communication Server l000E RIs. 6.0 software with a l005r Avaya CallPilot installed at that headquarters in London. The Avaya CallPilot installation has been completed and the CS1000E has been correctly configured.

    Which command and overlay is used to confirm that the AML link between the Avaya CallPilot and the CS1000E is fully operational?

    A. LD 11- STATLoop Shelf Card of the MGATECard

    B. LD48 - STATELAN

    C. LD 117 - STAT ELNK

    D. ID 22-STAT AML

  • Question 55:

    A company has decided to install an Avaya CallPilot 1005 server at their new office location to deliver multimedia messaging functionality to their employees. They will be using Fax and Desktop Messaging applications. A technician has been tasked with installing the new Avaya CallPilot server.

    What should the Automatic updates settings be set to?

    A. Automatic (recommended)

    B. Download updates for me, but let me choose when to install them

    C. Notify me but don't automatically download or install them

    D. Turnoff Automatic Updates

  • Question 56:

    A technician is installing a now Avaya CallPilot Server, and has programmed the new ACD Queue and virtual agents for the DS0 connectivity. In the Configuration Wizard, in which three fields is the information entered?

    A. TN, class ID, number of TNs to be added

    B. numberofTNs to be added, ACD Queue number,Key 0

    C. TNs, ACD Queue number, Key 0

    D. TN, Key 0, Key 1

  • Question 57:

    A technician is upgrading a 2011 to Avaya CallPilot RIs. 5.0. The image installs but the system hangs when booting into Windows 2003. Which two items should be checked? (Choose two.)

    A. The BIOS has been upgraded to 6.0.3.

    B. Thekeyboard and mouse are plugged in correctly.

    C. The external CD-ROM and Tape drive are connected.

    D. The BIOS option forOperating System type is set to 'other'.

  • Question 58:

    A company is running Communication Server l000E RIs. 6.0 software with a 1005r Avaya CallPilot server installed at their headquarters in London. The Avaya CallPilot installation has been completed and the CS1000E has been correctly configured.

    What will happen to a call if it is placed to CDN 3300?

    A. The call will be routed to Avaya CallPilot for treatment.

    B. The call will follow the default DN as configured on the CDN.

    C. The callerwill receive busy or overflow

    D. The caller willberedirected to the attendant/switchboard.

  • Question 59:

    A technician is preparing for an Avaya CallPilot installation and is reviewing site survey information. The customer wants to implement the desktop messaging feature, but on the survey there is no mention of desktop messaging seats. Where is it confirmed that desktop messaging seats were ordered?

    A. on the shipped packing list

    B. on the keycodecertificate

    C. in the AvayaCallPilotsystem afterimplementation

    D. in theconfigurationwizardduring implementation

  • Question 60:

    The Avaya CallPilot 600r server has one MPM96 card. The PBX it is connecting to will require MGate cards. How many MGate cards are needed to support 80 voice channels?

    A. 1

    B. 2

    C. 3

    D. 4

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Avaya exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 7303 exam preparations and Avaya certification application, do not hesitate to visit our Vcedump.com to find your solutions here.