  • Question 121:

    According to ITIL?v3 framework, which of the knowledge component groups contributes to the thorough design of event detection and alert mechanisms that are used in event management?

    A. incident prioritization and categorization codes, Service Level Requirements
    B. proactive problem management, Service Level Requirements
    C. change control management, Service Level Requirements
    D. capacity management, incident prioritization and categorization codes

  • Question 122:

    Which three factors should you consider when recommending a maintenance window to execute a rollout plan that is received from engineering? (Choose three.)

    A. service level agreements
    B. network capacity management
    C. key performance indicators
    D. time of day
    E. customer impact

  • Question 123:

    In addition to a DoS attack, what are three reasons that cause an increase in the CPU use of a route processor or the line card of a router? (Choose three.)

    A. processing packets that do not cause an exception
    B. receiving a packet greater than the MTU of the interface
    C. processing IPv6 packets lacking extension headers
    D. packets requiring fragmentation
    E. traffic that matches an ACL line that uses log keyword
    F. processing packets with IP options

  • Question 124:

    A customer calls the service desk and reports a reachability problem between two offices. The service desk determines that the link that connects one of the offices to the edge router is down.

    Which two steps should be taken before this incident is escalated to the carrier? (Choose two.)

    A. Issue a shutdown then a no shutdown to the interface on the CPE device.
    B. Reboot the edge router.
    C. Reboot the customer premises router.
    D. Check syslog and verify what time the link went down.

  • Question 125:

    A trouble ticket has been escalated from the service desk to you as a Tier 2 NOC engineer. The customer is complaining about slow application response time. The problem is between end-user workstations and a CRM application hosted on a redundant pair of servers in a data center. What are the two initial actions to further troubleshoot the network? (Choose two.)

    A. Ping the CRM server from multiple locations and compare round-trip times.
    B. Ask the IT department to fail over the CRM application to its backup server.
    C. Reboot the end-user workstations.
    D. Review recent network changes that were made prior to receiving complaints.

  • Question 126:

    What is the most effective tool to use to determine whether there is a physical layer problem with voice bearer trunks before escalating the trouble to the PSTN PTT carrier?

    A. ping
    B. CSU loopback
    C. traceroute
    D. bidirectional failure detection

  • Question 127:

    According to ITIL?v3 framework, which risk management step analyzes threats and weaknesses that are introduced as a result of a service change?

    A. risk impact
    B. risk mitigation
    C. risk assessment
    D. risk profile

  • Question 128:

    According to ITIL?v3 framework, which type of warranty assurance provides a customer with a measured confidence that services are supporting defined level of demand and quality?

    A. security
    B. availability
    C. capacity
    D. continuity
    E. fulfillment

  • Question 129:

    While evaluating a new hardware rollout plan before deployment, which standards should you review to ensure that the hardware met certain environmental design guidelines?

    A. NAS
    B. COBIT
    C. ITIL?
    D. NEBS
    E. eTOM

  • Question 130:

    Refer to the exhibit.

    The figure shows a service provider network that has MPLS TE tunnels that originate from GSR1, GSR2, and GSR3. While GSR1 and GSR2 have multiple paths to the core network, the GSR3 has a single path into the core. For GSR1 and GSR2, the purple links are the preferred paths, but because they are multihomed to the core, they can also take the black, less-desirable path. The less-desirable black paths need to be retained for certain operational reasons. GSR3 has a single path into the core network, and a TE tunnel originating from GSR3 must be able to use this path. It has been noted that if the network encounters multiple link failures or link transitions, the TE tunnels originating from GSR1 or GSR2 can preempt the TE tunnel originating from GSR3, thus causing a lack of MPLS connectivity. The operations team does not want the TE tunnel originating from GSR3 to be preempted unless this tunnel is administratively shut down.

    How should this situation be mitigated?

    A. Change TE config on GSR3 to include "priority 4 4."
    B. Change TE config on GSR3 to include "priority 6 4."
    C. Change TE config on GSR3 to include "priority 6 6."
    D. Use affinity and link coloring.
    E. Use the "exclude" options on the explicit paths of GSR1 and GSR2.
    F. Lower the signaled-bandwidth of the GSR3 TE tunnel.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Cisco exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your 350-060 exam preparations and Cisco certification application, do not hesitate to visit our Vcedump.com to find your solutions here.