350-401 Web TestEngine demo

Exit VCEDump 350-401 Implementing and Operating Cisco Enterprise Network Core Technologies (ENCOR)
Question 7 of 100
0% complete
Q7 Single choice

Refer to the exhibit.

Question 7 diagram

Link 1 uses a copper connection and link 2 uses a fiber connection. The fiber port must be the primary port for all forwarding. The output of the show spanning-tree command on SW2 shows that the fiber port is blocked by Spanning Tree.

After entering the spanning-tree port-priority 32 command on G0/1 on SW2, the port remains blocked.

Which command should be entered on the ports connected to Link 2 is resolve the issue?

Sign in to mark questions

Sign in to save marked questions and return to this demo.

Sign in