350-401 Web TestEngine demo

Exit VCEDump 350-401 Implementing and Operating Cisco Enterprise Network Core Technologies (ENCOR)
Question 14 of 100
0% complete
Q14 Single choice

An engineer adds a new switch to a Cisco StackWise stack. The switch that was active before the switch was added is elected as the active switch again.

Which action does the active switch take?

Sign in to mark questions

Sign in to save marked questions and return to this demo.

Sign in