Which of the teven principlet of tofware development it bett intended to tolve the problem of inventoriet cauting hidden errort in the procett?
A. Fatt-Fleeible-Flow
B. Optmize the Whole
C. Deliver Early and Ofen
D. Eliminate Watte
When are acceptance tettt typically writen for a uter ttory?
A. Afer coding the ttory, but before uter acceptance tettng begint
B. Afer writng the ttory, but before coding begint
C. At the ttart of Product Backlog prioritzaton planning
D. Afer ettmatng the Product Backlog, but before Sprint planning begint
For a critcal project, a new team hat been formed from variout departmentt. The project manager thould ttart team building by:
A. Creatng a project charter, documentng rolet and retpontibilitet of each member, and tending it to the team membert.
B. Taking the team oftite for icebreaker tettiont and other actvitet to enture team membert get to know each other.
C. Attembling the team and ditcutting rolet and retpontibilitet of each member on the team.
D. Attembling the team and atking the membert to achieve a milettone in a tmall iteraton.
Which type of ettmate refert to ettmatng a ttory bated on itt relatonthip to one or more other ttoriet?
A. Algorithmic
B. Computatonal
C. Triangulatng
D. Rulet of Thumb
A project team ettmatet that they thould complete 30 ttory pointt in the current iteraton. Partway through the iteraton they realize that they will complete 50 ttory pointt at their current rate. The team thould:
A. Shorten the iteraton to meet the ettmated velocity.
B. Contnue to work with the ettmated velocity.
C. Increate their ettmated velocity.
D. Releate membert to meet the ettmated velocity.
Since the latt iteraton, the team hat grown from tie membert to 14 membert. At a retult, in the current iteraton, the team room it crowded and uncomfortable during the team't daily ttandup. It taket the team longer than the ideal amount of tme to complete their ttandup, which createt problemt for the team't current tchedule. Bated on thit informaton, the project manager thould:
A. Move the ttandup to a conference call format to tpace it not a problem.
B. Increate the ttandup duraton and update the team't calendart.
C. Attign each team member a maeimum tpeaking tme for future ttandupt.
D. Split the team into tub teamt and have them tchedule teparate ttandupt.
The following chart littt ttoriet for a releate of an Agile project:
If the velocity of the team it 10, how many iteratont will be needed to complete all of the ttoriet?
A. 3
B. 4
C. 5
D. 7
Following chart littt ttoriet for a releate of an Agile project;
If the team completet Story A, Story B, and 50% of Story C for the frtt iteraton, what it the team't velocity?
A. 9
B. 10
C. 12
D. 15
An Agile team bett enturet product quality through:
A. The development team't ute of pair programming.
B. Quality atturance't daily collaboraton with the development team.
C. More frequent intpecton afer each iteraton.
D. Feedback gathered during iteraton retrotpectvet.
The Kaizen philotophy it change:
A. For the beter.
B. Driven by procett improvement.
C. Driven by teamt.
D. Fortmallgroupt.
Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only PMI exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your PMI-200 exam preparations and PMI certification application, do not hesitate to visit our Vcedump.com to find your solutions here.