  • Question 31:

    When utilizing the Nutanix cluster As Built Document generator, which two configuration elements should a consultant provide when running the run_as_built.exe command? (Choose two.)

    A. Data Services IP
    B. Cluster IP
    C. Remote Site IP
    D. Customer Name

  • Question 32:

    Refer to the exhibit.

    A consultant is deploying a cluster using the customer-provided IP addressing information.

    Which option in Foundation must be configured to ensure connectivity during the deployment?

    A. Link Aggregation
    B. Range Autofill
    C. Network Segmentation
    D. Multi-homing

  • Question 33:

    A consultant needs to review a customer's switch port configuration to identify any issues. Other customer requirements are as follows:

    1.

    Leverage LACP

    2.

    Native VLAN will not be used

    3.

    Use Multiple Upstream switches

    4.

    Use VLANs 20-25 and 30

    5.

    LACP Fallback has been Enabled

    6.

    vPC or MLAG has been configured

    What must be included in a configuration in order to meet these requirements?

    A. Native VLAN set to default Ports trucked to allow all necessary VLANs
    B. Native VLAN set to default Ports in access mode to allow all necessary VLANs
    C. Native VLAN set to 30 Ports Trunked to allow all necessary VLANs
    D. Native VLAN set to 30 Ports in access mode to allow all necessary VLANs

  • Question 34:

    An administrator is supporting a business critical environment and deploys metro availability to achieve a zero data loss configuration. The two clusters are connected by a 1GbE connection. A new workload is going to be deployed to this cluster. This workload requires a sustained 150MB/S of write throughput and 20MB/s of read throughput.

    Which change must be made to deploy the workload successfully on this cluster?

    A. The bandwidth must be increased to support this workload.
    B. The workload must be configured to read at greater than 12.5MB/S.
    C. The replication frequency must be less than 60 minutes.
    D. Zero data loss nearsync must be used to support this workload.

  • Question 35:

    A consultant is running operational verifications to validate cluster behaviors

    What will happen if one power supply is disconnected from a NX-3235-G9 chassis?

    A. The hardware status is updated to reflect the change in Prism Element, the hosts continues to run, but VMHA has started securing workloads by moving them to other nodes.
    B. The hardware status updates to reflect the change in Prism Element, the hosts continues to run, and the Host hardware power status alert is sent There is no impact on workloads.
    C. The hosts appears disconnected in Prism Element and VMs are restarting on the other hosts.
    D. The hosts appears disconnected in vCenter and VMs are restarting on the other hosts.

  • Question 36:

    Refer to Exhibit: A customer has completed and given the pre-delivery questionnaire to the consultant. The customer has indicated that they are using HPE/OEM hardware. Which action should the consultant take to prepare the laptop and Foundation networking for the installation?

    A. Configure Backplane Traffic Isolation.
    B. Set IP Addresses in CVM/Host subnet only.
    C. Set IP Addresses in both CVM/Host and IPMI subnets.
    D. Enable network segmentation.

  • Question 37:

    From a hypervisor, which IP address should the consultant use to connect to the locally tossed on?

    A. 192.168.5.254
    B. 172.16.19.2
    C. 10.100.5.5
    D. 192.168.1.254

  • Question 38:

    An administrator is trying to correct high cluster IOPs and Cluster Controller Latency. Networking is the suspected issue.

    Which networking parameters should be configured in the Nutanix cluster?

    A. Bond State and network latency
    B. Number of NICs connected and network latency.
    C. Number of NICs connected and frame size
    D. Number of NICs connected and bond state.

  • Question 39:

    Refer to the exhibit.

    The customer has an existing NX-3160 block and is adding a second node into it. Where should the node be installed?"

    A. 1
    B. 2
    C. 3
    D. 4

  • Question 40:

    A customer racks all nodes in the new cluster. The customer does not allow IPv6 for node discovery. The consultant is not allowed to use the consultant's own flat switch in the customer's environment. Which step should the consultant take to resolve this issue?

    A. Bare metal image all nodes with Foundation VM.
    B. Image each node individually with Foundation VM.
    C. Connect to the top of rack switch and discover the nodes with IPv4.
    D. Open a console to all nodes and statically assign IP addresses.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Nutanix exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your NCS-CORE exam preparations and Nutanix certification application, do not hesitate to visit our Vcedump.com to find your solutions here.