Exam Details

  • Exam Code
    :NCP-MCI-5.20
  • Exam Name
    :Nutanix Certified Professional - Multi cloud Infrastructure (NCP-5.20)
  • Certification
    :Nutanix Certified Professional (NCP)
  • Vendor
    :Nutanix
  • Total Questions
    :280 Q&As
  • Last Updated
    :May 07, 2024

Nutanix Nutanix Certified Professional (NCP) NCP-MCI-5.20 Questions & Answers

  • Question 261:

    When creating a VM on an AHV cluster, how is the initial placement of the VM determined?

    A. AHV uses a round robin algorithm, placing new VMs onto hosts based on the numerical order of their UUID

    B. The administrator right clicks on the desired host and selects Power on VM from the dropdown menu

    C. The Acropolis Dynamic Scheduler selects a host which provides adequate resources for the VMs configuration

    D. Placement is determined by the host that holds the new_VM token at the time of VM creation

  • Question 262:

    Which data savings technique utilizes stripes and parity calculation in a Nutanix cluster?

    A. Compression

    B. Parity strip

    C. Erasure coding

    D. Deduplication

  • Question 263:

    How should an administrator correct an SSL error when connecting to a Nutanix cluster?

    A. Add the SSL certificate to the workstation's trusted people store

    B. Create a new self-signed certificate for the cluster with a 4096 bit key

    C. Create a new SSL certificate for the cluster signed by an AD certificate authority

    D. Add the SSL certificate to an AD group policy applied to all computer objects

  • Question 264:

    An administrator adds a node with older generation processors to an existing AHV cluster with newer generation processors. What is the effect on live migration?

    A. Live migration continues to function as expected and VMs can move to any AHV host.

    B. Live migration is prevented until the administrator enables the legacy migration option.

    C. Live migration is prevented until the administrator manually changes the newer processor level.

    D. Live migration of VMs is prevented between newer and older processors.

  • Question 265:

    What is the expected operation during node addition when the new node has a different AOS version?

    A. The entire cluster is upgraded to the latest one-click release.

    B. The node is added and a separate upgrade operation must be performed.

    C. The addition fails and forces the administrator to image using standalone Foundation.

    D. The node is automatically re-imaged using the software currently running in the cluster.

  • Question 266:

    A customer has a 24-node cluster with all containers configured with RF3. Two different nodes have incurred a simultaneous HDD failure. What is the result?

    A. The cluster runs in a degraded state until the failed drives are replaced and the data has been restored to three replicas.

    B. Sixty minutes after the failures a rebuild of the lost data can remaining HDDs begins to restore to three replicas.

    C. The VMs with data on those drives crash, and an HA event occurs, restarting them on a remaining healthy node.

    D. The Nutanix cluster recognizes the failures and immediately begins to rebuild lost data to three replicas.

  • Question 267:

    What are two minimum prerequisites for live migration to succeed? (Choose two.)

    A. All AHV hosts have IP addresses in the same subnet

    B. All AHV hosts must be configured on the same VLAN

    C. All VMs have an IP address in the same subnet

    D. All VMs are configured for the same VLAN

  • Question 268:

    An administrator has been alerted to a VM that has high I/O latency and wants to determine if there are any other factors, such as insufficient network or memory resources that correlate, as part of a troubleshooting process. Which type of chart should the administrator create to allow all relevant data to be easily exported to CSV for later analysis?

    A. A VM entity chart with each of the relevant metrics.

    B. A cluster metric chart for each of the relevant metrics

    C. A cluster entity chart with each of the relevant metrics

    D. A VM metric chart for each of the relevant metrics

  • Question 269:

    Which method can be used to migrate a VM configured for UEFI-boot from a Nutanix Hyper-V cluster to AHV?

    A. Live Migration

    B. Storage vMotion

    C. Nutanix Move

    D. Cloud Connect

  • Question 270:

    The Linux administration team has requested access rights to any current or future Linux VM in the environment. What entity should be selected when assigning this new role?

    A. Image

    B. AHV Cluster

    C. Category

    D. Project

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Nutanix exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your NCP-MCI-5.20 exam preparations and Nutanix certification application, do not hesitate to visit our Vcedump.com to find your solutions here.