MB6-822 Exam Details

  • Exam Code
    :MB6-822
  • Exam Name
    :AX 2009 Production
  • Certification
    :MCITP
  • Vendor
    :Microsoft
  • Total Questions
    :60 Q&As
  • Last Updated
    :Dec 12, 2021

Microsoft MB6-822 Online Questions & Answers

  • Question 1:

    When using Job scheduling, what planning principle is available, that is not available with Operation scheduling?

    A. Planning with queue times
    B. Planning on task groups
    C. Planning with resource efficiency percent
    D. Planning with transportation times

  • Question 2:

    During scheduling, which method will account for the extra use of capacity due to material scrapped, without producing or consuming extra items?

    A. Set up a scrap percentage in the route.
    B. Set up a higher consumption of materials on the production BOM.
    C. Set up a scrap type on the production BOM.
    D. Start a greater quantity corresponding to the yield

  • Question 3:

    After running Master scheduling, what is the quickest way to view the results, including the number of lines requirement planned, planned orders created, and the processing time required?

    A. Gross requirements
    B. Net requirements
    C. Session log
    D. Actions report

  • Question 4:

    A company has limited capacity on its machines, but the capacity of the operators is unlimited (already set on the work center). The team manager wants to plan on the machinery and see the required staff hours in the production plan. What setup meets the managers requirements?

    A. The route is set up with two operations with different operation numbers, one to control the operator and one to control the machinery. Scheduling is done with finite capacity.
    B. The route is set up with two operations with the same operation number, a primary one to control the machinery and a secondary one to control the operator. Scheduling is done with finite capacity.
    C. The route is set up with the use of priority on operations, and scheduling is done with infinite capacity.
    D. The route is set up with the use of priority on operations. The scheduling is done with infinite capacity, and the task group is created on the operators resource.

  • Question 5:

    What setup determines whether items for a production can be reserved automatically?

    A. The items' inventory dimension groups
    B. The items' inventory model groups
    C. Production order setting
    D. Inventory management parameters

  • Question 6:

    All items in inventory have a batch number. The batch number is not being printed in the production picking list journal. What can be done to ensure the batch number prints on the report?

    A. Set it up in the production parameters.
    B. Set it up on the production picking list journal.
    C. Set it up when printing the production picking list journal.
    D. Set it up in the production order default values.

  • Question 7:

    What information in the Basic module is required to use production orders? Choose the 3 that apply.

    A. Work centers
    B. Employees
    C. Calendars
    D. Working times

  • Question 8:

    Which inventory parameters are mandatory? Choose the 2 that apply.

    A. Location
    B. Configuration
    C. Site
    D. Serial Number

  • Question 9:

    Which of the following is the most accurate way to describe the work center structure in Microsoft Dynamics AX 2009?

    A. The companys work centers are divided into two levels, with the higher level being routing groups and the lower level being cost categories.
    B. The company's work centers are defined hierarchically, with an unlimited number of levels.
    C. The companys work centers are divided into two levels consisting of work center groups and work centers.
    D. The work center definitions in Microsoft Dynamics AX are composed of three tiers, work center groups, work centers and sub-contractor work centers.

  • Question 10:

    When calculating a sales price for a BOM from a sales order line, where can you select the profit- setting?

    A. In the Inventory management parameters
    B. On the BOM lines
    C. In the BOM report as finished journal
    D. In the BOM calculation

Related Exams:

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Microsoft exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your MB6-822 exam preparations and Microsoft certification application, do not hesitate to visit our Vcedump.com to find your solutions here.