  • Question 331:

    The length of wooden beams being sawed is measured by a line operator. Which is least likely to be influenced by the instrument?

    A. Calibration of the instrument
    B. Actual temperature of the liquid
    C. Recording the measurement
    D. Reading of the instrument

  • Question 332:

    When describing a process being considered for cycle time reduction, the existing process flows are known as a:

    A. Activity network diagram (AND)
    B. Dynamic pull chart
    C. Key operation points (KOPS)
    D. Current state map

  • Question 333:

    As we identify customer and supplier requirements for a SIPOC we are urged to use the RUMBA approach which stands for _____________, Understandable, Measurable, Believable and Achievable.

    A. Rational
    B. (un)Resistable
    C. Relatable
    D. Reasonable

  • Question 334:

    The Cost of Poor Quality (COPQ) is comprised of which two of the following? (Choose two.)

    A. Tangible (Visible) Costs
    B. Input Costs
    C. Production
    D. Hidden Costs

  • Question 335:

    Which of the following is used to test the significance for the analysis of a Variance Table?

    A. t Test
    B. F Test
    C. Chi Square Test
    D. Acid Test

  • Question 336:

    The traditional methods of obtaining customer information could also include:

    A. big data analysis
    B. usage of brainstorming
    C. Data warehousing and mining
    D. creating macros in excel

  • Question 337:

    Lean Principles defines for us ________ specific areas where waste typically exists in our processes.

    A. Three
    B. Five
    C. Seven
    D. Nine

  • Question 338:

    Which of the following management tools requires the least preliminary knowledge about a subject or activity?

    A. Prioritization matrices
    B. Matrix diagrams
    C. Affinity diagrams
    D. Activity network diagrams

  • Question 339:

    Having an Alpha of .05 and a Beta of .10 are the most common risk levels when running a Statistical test.

    A. True
    B. False

  • Question 340:

    Which tool is best to utilize to assist in determining solution priorities?

    A. Cost Benefit Analysis
    B. Control Plan
    C. FMEA
    D. Response Plan

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Six Sigma exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your LSSYB exam preparations and Six Sigma certification application, do not hesitate to visit our Vcedump.com to find your solutions here.