Six Sigma LSSWB Online Questions & Answers

  • Question 141:

    When prioritizing Six Sigma projects within an organization:

    A. The project with the statistically lowest sigma level should always be prioritized
    B. The project with the highest potential cost savings should always be prioritized.
    C. The project with the highest potential customer satisfaction increase should always be prioritized.
    D. All of the above should be considered and statistically researched before choosing the best option for the organization at hand.

  • Question 142:

    In the Six Sigma "DMAIC" improvement framework, the letter "M" stands for:

    A. Multiply
    B. Minimize
    C. Magnify
    D. Measure

  • Question 143:

    What does the Value Stream mean?

    A. is the sequence of all items, events and people required to produce an end result.
    B. is used to identify areas of concern, waste and improvement.
    C. Neither A nor B
    D. Both A and B

  • Question 144:

    What is regression?

    A. It is a procedure used to monitor process behavior.
    B. Regression is used for establishing the relationship between input and output variables.
    C. It is an output variable set of six Sigma.
    D. It is a defined relationship between x bar and R charts.

  • Question 145:

    Competitive evaluation is done after the House of Quality is completed.

    A. True
    B. False

  • Question 146:

    A trend (in control charting) is typically described as:

    A. Seven points in a row either above or below the center line
    B. Seven points in a row in either an upward or downward direction
    C. Seven points in a row that are beyond the control limits
    D. Seven data points in a subgroup

  • Question 147:

    The grand average of the subgroup averages is known as:

    A. X-bar bar
    B. X-double bar
    C. The grand average
    D. All of the above

  • Question 148:

    What is flowcharting in sigma belt?

    A. It is a diagram, which displays the steps of a process.
    B. It is a chart, which shows the total production rate of a process.
    C. It is a chart of production in six Sigma.
    D. It is a measuring process to measuring the average spread of data.

  • Question 149:

    If you were to roll a single die 10 times, the result of each roll would be __________.

    A. Mutually exclusive of the other nine rolls
    B. Proportional to the other nine rolls
    C. Independent of the other nine rolls
    D. Dependent upon the other nine rolls

  • Question 150:

    The Motorola company is credited with the origin of the Six Sigma Methodology.

    A. True
    B. False

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only Six Sigma exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your LSSWB exam preparations and Six Sigma certification application, do not hesitate to visit our Vcedump.com to find your solutions here.