USGBC LEED-AP-O+M Online Questions & Answers

  • Question 81:

    Which of the following strategies is most important for achieving economic and environmental performance in a LEED project?

    A. Retain a LEED AP
    B. Perform a full life-cycle assessment
    C. Bring the project team together in the performance phase
    D. Take an integrative approach

  • Question 82:

    What is the maximum allowed performance period defined for re-certification of a LEED Operations and Maintenance building?

    A. Five years from the date that Green Business Certification Inc. (GBCI) initially certified the building
    B. 12 months from the date that GBCI initially certified the building
    C. Five years from the date that the project was initially registered with GBCI
    D. 12 months from the end date of the last performance period of the initial certification

  • Question 83:

    What credit or prerequisite requires a plan for a hazardous spill cleanup?

    A. Indoor Environmental Quality Prerequisite, Green Cleaning Policy
    B. Materials and Resources Credit, Solid Waste Management - Ongoing
    C. Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies
    D. Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program

  • Question 84:

    Storage locations are required for which of the following recyclable materials?

    A. Mixed paper, paint, glass, plastics and electronics
    B. Mixed paper, corrugated cardboard, wood pallets, plastics and metals
    C. Mixed paper, batteries, glass, plastics and electronics
    D. Mixed paper, corrugated cardboard, glass, plastics and metals

  • Question 85:

    In densely populated rooms, CO2 monitors must be located a minimum of how many feet (meters) above the floor?

    A. 2 ft. (0.6 m)
    B. 3 ft. (0.9 m)
    C. 4 ft. (1.2 m)
    D. 5 ft. (1.5 m)

  • Question 86:

    When a building owner is deciding whether to execute an ASHRAE Level 2 audit or commissioning for Energy and Atmosphere Credit, Existing Building Commissioning -Analysis, which of the following statements most appropriately explains the difference between an ASHRAE Level 2 audit and commissioning of an existing building?

    A. An ASHRAE Level 2 audit is required for newer buildings while commissioning is required for buildings in operation for more than five years
    B. An ASHRAE Level 2 audit requires development of an energy use breakdown based on sub-metering while commissioning requires development of an energy use breakdown based on energy modeling
    C. An ASHRAE Level 2 audit involves testing the operation of the systems against the sequences of operation while commissioning involves determining that the system operation meets the owner's current facility requirements
    D. An ASHRAE Level 2 audit focuses on finding major upgrades to the building envelope or me-chanical, electrical, or controls systems while commissioning focuses on controls, proper sys-tem operations, and efficiency improvements

  • Question 87:

    A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most appropriate one to use?

    A. LEED Interior Design and Construction
    B. LEED Building Design and Construction
    C. LEED for Homes
    D. No rating system

  • Question 88:

    Which of the following people are required to be listed on the LEED project registration page?

    A. Owner
    B. LEED AP
    C. Primary Architect
    D. Commissioning (Cx) agent

  • Question 89:

    Which role is responsible for maintaining documentation in LEED Online during O+M certification?

    A. Commissioning Authority
    B. Contractor
    C. Project Administrator
    D. Facility maintenance staff

  • Question 90:

    The measures called out on the following site plan may contribute to the achievement of which LEED credits? (Click on Exhibit)

    A. Sustainable Sites Credit, Rainwater Management; Sustainable Sites Credit, Light Pollution Reduction
    B. Sustainable Sites Credit, Rainwater Management; Sustainable Sites Credit, Heat Island Reduction
    C. Sustainable Sites Credit, Rainwater Management; Location and Transportation Credit, Alternative Transportation
    D. Sustainable Sites Credit, Rainwater Management; Indoor Environmental Quality Credit, Integrated Pest Management

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only USGBC exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your LEED-AP-O+M exam preparations and USGBC certification application, do not hesitate to visit our Vcedump.com to find your solutions here.