  • Question 91:

    An agile software development organization has recently hired a senior tester. The organization has distributed teams spread across time zones. They need to share test status with various stakeholders including upper management and customers at a regular interval. Which of the following statements seems to be correct with regards to the communication?

    A. Since the stakeholders include customers frequent informal communication without a specific frequency works better.
    B. Agile nature of the project means very less documentation and hence the status need not be documented and shared in a formal manner
    C. Since the stakeholders include upper management, formal reports delivered face-to-face are critical.
    D. Distributed nature of teams working in various time zones means email communication will work better

  • Question 92:

    Which of the following is the main benefit of a configuration management of testware?

    A. All testware is backed up with restore option, including incident reports and change requests.
    B. The testware can be traced to information in requirements tools and to the bug tracking system.
    C. All testware items are identified, version controlled, tracked tor changes with relation to each other
    D. There is an easy way to assess the level to test coverage provided by the existing tests

  • Question 93:

    Which of the following metrics relates to the number of defects per unit size of a work product?

    A. Requirement coverage
    B. Average operating time until failure
    C. Fault density
    D. Number of executed test cases in relation to non-executed test cases

  • Question 94:

    Which ONE of the following options BEST describes a key characteristic of non-functional testing?

    A. Performing non-functional testing starting at the system test level.
    B. Conducting non-functional testing exclusively at the acceptance test level.
    C. Limiting non-functional testing to security testing and performance testing only.
    D. Ensuring non-functional testing focuses only on user experience and usability.

  • Question 95:

    A test case fails because the system crashes when saving a record. What is the immediate result called?

    A. Defect
    B. Error
    C. Failure
    D. Incident

  • Question 96:

    Which one of the following is a typical entry criteria for testing?

    A. Planned tests have been executed.
    B. Availability of testable requirements.
    C. The number of unresolved defects is within an agreed limit.
    D. The number of estimated remaining defects is sufficiently low.

  • Question 97:

    In which of the following test documents would you expect to find test exit criteria described9

    A. Test design specification
    B. Project plan
    C. Requirements specification
    D. Test plan

  • Question 98:

    A class grade application for instructors assigns letter grades based on students' numerical grades.

    The letter grades for different numerical grades should be: Above 89, up to 100 - A Above 79, up to 89 - B Above 69, up to 79 - C Above 59, up to 69 - D Below 60 - F

    Which of the following sets of test inputs would achieve the relatively highest equivalence partition coverage?

    A. 0, 58.59,70, 80
    B. 74, 79.84,85, 89
    C. 79, 89.90,99, 100
    D. 69, 79. 80, 89, 90

  • Question 99:

    In which of the following cases you would NOT execute maintenance testing?

    A. Retirement of the software or system
    B. Modifications to a released software or system
    C. Migration of the system data to a replacement system
    D. Update to the Maintainability requirements during the development phase

  • Question 100:

    Which of the following statements is an example of testing contributing to higher quality?

    A. A test leader writes a test summary report
    B. A project manager asks to a test leader to estimate the test effort
    C. A tester installs a test ten in the lest environment
    D. A tester finds a bug which is resolved prior to release

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only ISTQB exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your ISTQB-CTFL exam preparations and ISTQB certification application, do not hesitate to visit our Vcedump.com to find your solutions here.