ISTQB-CT-TAE Exam Details

  • Exam Code
    :ISTQB-CT-TAE
  • Exam Name
    :ISTQB Certified Tester Test Automation Engineer
  • Certification
    :ISTQB Certifications
  • Vendor
    :ISTQB
  • Total Questions
    :162 Q&As
  • Last Updated
    :May 29, 2026

ISTQB ISTQB-CT-TAE Online Questions & Answers

  • Question 61:

    Which of the following statements, related to aspects of the SUT to be considered when designing a TAA, is mostly true?

    A. All the interactions between SUT and TAS should be logged with the highest level of detail
    B. All the internal test interfaces of the SUT should be removed prior to the product release
    C. All the interfaces of the SUT affected by the tests should be controllable by the TAA
    D. All the external test interfaces of the SUT should be removed prior to the product release

  • Question 62:

    When if the BEST time for automation to consider legal and/or standard requirements for a SUT?

    A. When implementing the SUT
    B. When designing a TAF
    C. When designing a TAA
    D. When developing a TAS

  • Question 63:

    Assume that you are executing the first test run of a test automation suite that consists of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored to a small database. During such run you observe that the first 10 tests pass while an abnormal termination occurs when executing the 11th test: this test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be too time consuming since you have been asked to produce as soon as possible a detailed report of the test execution results for the first test run.

    Based only on the given information, which of the following would you expect to be the most important action to be performed immediately after the abnormal termination occurred during the execution of the 11th test, in this scenario?

    A. Re-running the test automation suite limited to the subsequent tests
    B. Returning the database to a consistent state that allows subsequent tests to run
    C. Making a backup of the database for later analysis
    D. Re-running the test automation suite from the beginning

  • Question 64:

    A defect was fixed, confirmed by an automated re-test, and then the confirmation test was added to the automated regression suite. In a later release, the same defect appears again.

    What is the MOST likely explanation?

    A. Confirmation testing should never be automated
    B. The regression suite cannot detect re-occurring defects
    C. Configuration management failed to ensure the corrected software components were properly synchronized
    D. The defect should have been tested only manually

  • Question 65:

    What is the primary reason for automating a confirmation test?

    A. To verify that a new fix works correctly
    B. To test that a fix made in a prior release is still working
    C. To confirm that a fix doesn't break anything else
    D. To decrease the time it takes to test a new fix

  • Question 66:

    You are reviewing the testability of your SUT.

    Which of the following BEST refers to the characteristic of OBSERVABILITY?

    A. The ability of the SUT to perform its intended function for a specified period of time
    B. The ability to exercise the SUT by entering inputs, triggering events and invoking methods
    C. The ability of the SUT to prevent unauthorized access to its components or data.
    D. The ability to identify states, outputs, intermediate result and error messages in the SUT

  • Question 67:

    You are working on a government system called "Making Tax Digital" or MTD for short. This system is being implemented to stop manual human input error and also to reduce fraudulent behaviour from companies when submitting their tax and VAT returns.

    The key concept is that registered companies will need to use government recommended 3rd party software for their accounts and book keeping. These 3rd party applications will have a direct interface into the government's main system for transactions and submissions. You have been using a test execution tool successfully on the project so far. and have implemented a basic "capture/replay" approach to scripting.

    The management have been encouraged with the automation so far, but want the following objectives to be met:

    1. Test cases added easily.

    2. Reduction in the amount of scripts and script duplication.

    3. Reduction in maintenance costs.

    Which scripting technique would be MOST suitable in this scenario in order to meet the objectives?

    A. Linear scripting
    B. Structured scripting
    C. Data-driven scripting
    D. Keyword-driven scripting

  • Question 68:

    New features have been added for the current release of a SUT.

    Which action would NOT be appropriate for the TAE to perform when evaluating the impact on the TAS?

    A. Gather feedback from the Business Analysts to determine if the current TAS will meet the needs of the new features.
    B. Review existing keywords to see if they need to be modified.
    C. Run existing automated tests against the updated SUT to verify and record any changes to their correct operation.
    D. Evaluate compatibility with existing test tools and, where necessary, identify alternative solutions.

  • Question 69:

    You have investigated a new tool which enables the modelling of the SUT and can then generate test cases either manually or automatically. You have convinced your managers that the best way forward is to conduct a pilot project for this tool. You need to select a project to use for the pilot. You have the choice of the following projects: Project A: A two-year project that is critical to the business and is currently in the requirement phase. This project is for a new e-commerce web site and is mostly being developed "in-house" although the payment system is being developed and delivered by a 3rd party provider.

    Project B: A safety critical application for software to drive and park cars.

    Project C: An upgrade to an important HR timesheet tracking application that will be available on a desktop and mobile application. This is a 1-month project developed in-house.

    Project D The payment system from project A.

    Which project would be BEST for the pilot?

    A. Project A because it is a large project and has high visibility and is in the requirement phase.
    B. Project B because it is a safety critical system and has high visibility.
    C. Project C because it is a short, low priority project but is important.
    D. Project D because it is a small part of a larger project and will help show the tool's capabilities.

  • Question 70:

    What is a realistic expectation for the ratio of failures to defects?

    A. There are usually more failures than defects.
    B. There are usually more defects than failures.
    C. They usually occur in the same proportion.
    D. Only defects should be tracked because a failure may not indicate a defect.

Tips on How to Prepare for the Exams

Nowadays, the certification exams become more and more important and required by more and more enterprises when applying for a job. But how to prepare for the exam effectively? How to prepare for the exam in a short time with less efforts? How to get a ideal result and how to find the most reliable resources? Here on Vcedump.com, you will find all the answers. Vcedump.com provide not only ISTQB exam questions, answers and explanations but also complete assistance on your exam preparation and certification application. If you are confused on your ISTQB-CT-TAE exam preparations and ISTQB certification application, do not hesitate to visit our Vcedump.com to find your solutions here.